A - 

Open both manifold valves and start the vacuum pump.

B - 

NOTE - During the early stages of evacuation, it is desirable to close the manifold gauge valve at least once. A rapid rise in pressure

indicates a relatively large leak. If this occurs, 

repeat the leak testing procedure.

NOTE - The term absolute pressure means the total actual pressure above absolute zero within a given volume or system. Absolute

pressure in a vacuum is equal to atmospheric pressure minus vacuum pressure.

C - 

When  the  absolute  pressure  reaches  23,000  microns (29.01 inches of

mercury), perform the following:

Close manifold gauge valves.
Close valve on vacuum pump.
Turn off vacuum pump.
Disconnect manifold gauge center port hose from vacuum pump.
Attach  manifold  center  port  hose  to  a  nitrogen  cylinder  with  pressure

regulator set to 150 psig (1034 kPa) and purge the hose.
Open manifold gauge valves to break the vacuum in the line set and indoor

unit.
Close manifold gauge valves.

D - 

Shut off the nitrogen cylinder and remove the manifold gauge hose from the cylinder. Open the manifold gauge valves to release the

nitrogen from the line set and indoor unit.

E - 

Reconnect the manifold gauge to the vacuum pump, turn the pump on, and continue to evacuate the line set and indoor unit until the

absolute pressure does not rise above 500 microns (29.9 inches of mercury) within a 20-minute period after shutting off the vacuum pump

and closing the manifold gauge valves.

F - 

When the absolute pressure requirement above has been met, disconnect the manifold hose from the vacuum pump and connect it to a

cylinder of HFC-410A positioned to deliver liquid refrigerant. Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the

line set and indoor unit.

G - 

Perform the following:

Close manifold gauge valves.
Shut off HFC-410A cylinder.
Reinstall service valve cores by removing manifold hose from service valve. Quickly install cores with core

tool while maintaining a positive system pressure.
Replace stem caps and finger tighten them, then tighten an additional one-sixth (1/6) of a turn as illustrated.

OUTDOOR

UNIT

TO VAPOR

SERVICE VALVE

TO LIQUID LINE

SERVICE VALVE

MICRON

GAUGE

VACUUM PUMP

1/4 SAE TEE WITH SWIVEL

COUPLER

500

MANIFOLD

GAUGE SET

HFC-410A

RECOMMEND

MINIMUM 3/8” HOSE

A - 

Connect low side of manifold gauge set with

1/4 SAE in-line tee to 

vapor 

line service valve

B - 

Connect high side of manifold gauge set to

liquid 

line service valve

C - 

Connect available micron gauge connector

on the 1/4 SAE in-line tee.

D - 

Connect the  vacuum pump (with vacuum

gauge)  to  the  center  port  of  the  manifold

gauge set. The center port line will be used

later for both the HFC-410A and nitrogen

containers.

HIGH

LOW

1

2

3

4

5

6

7

8

9

10

11 12

1/6 TURN

NITROGEN

3

CONNECT GAUGE SET

A

B

C

D

4

EVACUATE THE SYSTEM

NOTE - Remove cores from service valves (if not already done).

Possible equipment damage.
Avoid deep vacuum operation. Do not use

compressors  to  evacuate  a  system.

Extremely low vacuum can cause internal

arcing  and  compressor  failure.  Damage

caused  by  deep  vacuum  operation  will

void warranty.

WARNING !

EVACUATION

H - 

Open suction service valve first before liquid valve to release the unit charge into the system. Replace valve

caps and tighten (8 ft. lb.). Caps are the primary seal.

Evacuate the line set and indoor unit until a slight vacuum is indicated on the micron gauge (approximately 23,000 microns or 

29.01 inches of mercury).

NOTE - Position 

canister to deliver 

liquid refrigerant.

Содержание 4HP16

Страница 1: ...ed thoroughly after cleaning In coastal areas the coil should be cleaned with potable water several times per year to avoid corrosive buildup salt NOTICE This manual must be left with the homeowner for future reference This is a safety alert symbol and should never be ignored When you see this symbol on labels or in manuals be alert to the potential for personal injury or death Installation and se...

Страница 2: ...nstalled on a solid foundation This foundation should extend a minimum of 2 inches beyond the sides of the outdoor section To reduce the possibility of noise transmission the foundation slab General Read this entire instruction manual as well as the instructions supplied in separate equipment before starting the installation Observe and follow all warnings cautions instructional labels and tags Fa...

Страница 3: ...48 Between units 24 Against wall 6 Maximum soffit overhang is 36 NOTE At least one side should be unobstructed by a wall or other barrier Table 2 Clearances 30 around Control Box 24 6 NOTE See Table 2 for specific minimum clearance guidelines Figure 2 DO LOCATE THE UNIT With proper clearances on sides and top of unit On a solid level foundation or pad unit must be level to within 1 4 in ft per com...

Страница 4: ... 8 042 3 8 3 8 7 8 7 8 048 3 8 3 8 7 8 7 8 060 3 8 3 8 7 8 1 1 8 Field supplied 7 8 x 1 1 8 connector required on both ends of vapor tubing Table 3 Recommended Liquid Vapor Tube Diameters in Be extra careful with sharp bends Tubing can kink very easily and if this occurs the entire tube length will have to be replaced Extra care at this time will eliminate future service problems It is recommended...

Страница 5: ... UNIT VAPOR LINE SERVICE VALVE VAPOR LIQUID 1 A B C D A Cylinder with clean R 410A positioned to deliver liquid refrigerant to the vapor service valve B Refrigerant gauge set low side to the liquid line valve C Refrigerant gauge set center port to inlet on the recovery machine with an empty recovery tank connected to the gauge set D Connect recovery tank to recovery machine per machine instruction...

Страница 6: ...oil Shown Sensing bulb insulation is required if mounted external to the coil casing sensing bulb installation for bulb positioning STUB END TEFLON RING LIQUID LINE ASSEMBLY WITH BRASS NUT DISTRIBUTOR ASSEMBLY 3 Install one of the provided Teflon rings around the stubbed end of the check expansion valve and lightly lubricate the connector threads and expose surface of the Teflon ring with refriger...

Страница 7: ...round Do not crimp end of the line Remove service cap and core from both the vapor and liquid line service ports 1 2 LIQUID LINE SERVICE VALVE SERVICE PORT CORE SERVICE PORT CAP SERVICE PORT CORE SERVICE PORT CAP CUT AND DEBUR LINE SET SIZE MATCHES SERVICE VALVE CONNECTION DO NOT CRIMP SERVICE VALVE CONNECTOR WHEN PIPE IS SMALLER THAN CONNECTION 3 VAPOR LINE SERVICE VALVE COPPER TUBE STUB REFRIGER...

Страница 8: ...VES POINT FLAME AWAY FROM SERVICE VALVE PREPARATION FOR NEXT STEP 7 WRAP SERVICE VALVES To help protect service valve seals during brazing wrap water saturated cloths around service valve bodies and copper tube stubs Use additionalwater saturated cloths underneath the valve body to protect the base paint 4 FLOW NITROGEN Flow regulated nitrogen at 1 to 2 psig through the refrigeration gauge set int...

Страница 9: ... of the manifold gauge set in order to pressurize the line set and the indoor unit E After a few minutes open one of the service valve ports and verify that the refrigerant added to the system earlier is measurable with a leak detector F After the line set has been connected to the indoor and outdoor units check the line set connections and indoor unit for leaks Use the following procedure to test...

Страница 10: ...uid refrigerant Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit G Perform the following Close manifold gauge valves Shut off HFC 410A cylinder Reinstall service valve cores by removing manifold hose from service valve Quickly install cores with core tool while maintaining a positive system pressure Replace stem caps and finger tighten them t...

Страница 11: ... breaker may result in property damage Size wiring and circuit breaker s per Product Specifications and unit rating plate WARNING ELECTROSTATIC DISCHARGE ESD Precautions and Procedures Electrostaticdischargecanaffectelectroniccomponents Take care during unit installation and service to protect the unit s electronic controls Precautions will help to avoid control exposure to electrostatic discharge...

Страница 12: ...example of control wiring connections when using a standard thermostat Any excess high voltage field wiring should be trimmed and secured away from any low voltage field wiring To facilitate a conduit a cutout is located in the bottom of the control panel Connect conduit to the control panel using a proper conduit fitting ROUTING HIGH VOLTAGE GROUND AND CONTROL WIRING WIRE RUN LENGTH AWG INSULATIO...

Страница 13: ...ure auto reset trip at 25 psig reset at 40 5 Add refrigerant if subcooling is lower than table Recover refrigerant if subcooling is high 6 If ambient temp is lower than 60 F check charge in heating mode or weigh refrigerant according to name plate data Heating Mode Check charge in heating mode if ambient temp is below 60 F Indoor temp must be between 65 and 75 F Follow steps 1 to 6 above and compa...

Страница 14: ...ult code Heating and cooling operation will be allowed in this fault condition NOTE The coil temperature probe is designed with a spring clip to allow mounting to the outside coil tubing Coil sensor location is important for proper defrost operation Ambient Sensor The ambient sensor considers outdoor temperatures below 35 F 37 C or above 120 F 48 C as a fault If the ambient sensor is detected as b...

Страница 15: ... F 2 C the control board will initiate a defrost cycle Actuation When the reversing valve is de energized the Y1 circuit is energized and the coil temperature is below 35 F 2 C the board logs the compressor run time If the board is not calibrated a defrost cycle will be initiated after 30 minutes of heating mode compressor run time The control will attempt to self calibrate after this and all othe...

Страница 16: ...not perform demand or time temperature defrost operation System will still heat or cool ON ON Fault Demand Defrost Control Failure Indicates that demand defrost control has internal component failure Cycle 24VAC power to control board If code does not clear replace control board OFF SLOW Flash Fault Low Pressure Fault Restricted air flow over indoor or outdoor coil Improper refrigerant charge in s...

Страница 17: ...r is installed on the DELAY pins the compressor will be cycled off for 30 seconds going in and out of the defrost mode Units are shipped with jumper installed on DELAY pins NOTE The 30 second off cycle is NOT functional when TEST pins on P1 are jumpered P6 TST PS DF C R O Y1 Y2 Factory Test Connectors No field use DS1 RED LED Diagnostic LED Control board LEDs may be OFF ON or FLASHING to indicate ...

Страница 18: ...bent fins may affect unit operation SHARP OBJECT HAZARD Condenser coils have sharp edges Wear adequate body protection on body extremities e g gloves FAILURE TO FOLLOW THIS WARNING COULD RESULT IN BODILY INJURY WARNING Painted Surfaces For maximum protection of the unit s finish a good grade of automobile wax should be applied every year In geographical areas where water has a high concentration o...

Страница 19: ...the defrost cycle In case of extended power outage If the outdoor temperature is below 50 F and power to your outdoor unit has been interrupted for one hour or longer observe the following when restoring power to your heat pump system Set the room thermostat selector to the Emergency Heat setting to obtain temporary heat for a minimum of 6 hours This will allow system refrigerant pressures and tem...

Страница 20: ...507919 01 Page 20 of 21 Issue 1946 Figure 7 Wiring Diagram 018 030 Models Y2 IS NOT USED WITH SINGLE STAGE UNITS 5 5 ...

Страница 21: ...Page 21 of 21 507919 01 Issue 1946 Figure 8 Wiring Diagram 036 060 Models 5 Y2 IS NOT USED WITH SINGLE STAGE UNITS 5 ...

Отзывы: