
Model 410
Owner’s Manual
6/24/2014
13
Installation Steps and Start-Up Procedures, Cont.
Step 2
Turn Off Water Supply
A.
Turn off the water supply.
B.
Open the hot and cold water taps to depressurize the lines.
Step 3
Connect Water Lines
A.
Remove the valve cover.
1.
Open the salt port lid on the valve cover.
2.
Place your fingertips on the bottom, inner edge of
the valve cover. (You may need to use
two hands).
3.
Squeeze the edge and pull the valve cover
toward yourself until it clicks free. See Figure 5.
4.
Lift and remove the valve cover.
B.
Install Qest fittings if necessary. Qest connection
fittings are provided with your appliance with built-in
bypass.
Qest fittings provide a convenient, easy-to-
use three-piece assembly for 3/4-inch (19-mm)
copper plumbing or 3/4-inch (19-mm) CTS CPVC
plastic tubing. Ensure that the three components (1:
collar, 2: metal retaining ring, and 3: nylon sleeve)
are correctly installed in sequence on the pipe.
See Figure 6.
Caution:
Teflon tape or plumber’s putty is NOT
necessary and should NOT be used with Qest
fittings.
Note:
See
Optional Plumbing Procedures
for
information on copper fittings and joining plastic pipe.
C.
Attach the water lines to the appliance in compliance
with all state and local, building, plumbing, and
electrical codes. See Figure 7. Do NOT over tighten
the connections on the plastic threads.
D.
Check the arrows on the valve to ensure that the
water flows in the proper direction.
Caution:
Do NOT plumb your appliance in
backward.
Figure 5: Remove Valve Cover
Figure 6: Qest Fittings
Figure 7: Connect Water Lines
(Shown with Bypass Valve)
Содержание Maximizer 410
Страница 35: ...Notes...