
35-8
OPERATING INSTRUCTIONS
4. Raise your left and right levels to they are
within the ranges set on the MD3. (Both sets
of lights must be illuminated before folding the
90ft section– see illustration C) Fold the 90ft
section (D) in by pressing IN on the 80/90/100
BOOM EXTENSION switch (A) and holding
until they are all the way in. NOTE: the booms
must be past 15 inches on the LPS3 and
LPS6 (B) to fold the 90ft section. BE SURE
that you are not around any power lines be-
fore the message (E) is acknowledged in the
MD3 by pressing F2 (ACK).
D
D
A
B
C
E