background image

18 

 

ATTACHMENT SYSTEM 

3.  Disengage the quick attach lock assemblies.  

To disengage the lock assembly, pull the pin out as far as it will go until it is in the lock-out position. 
*Lock-out position prevents re-locking while attaching or detaching NTB. 

 

 

        

              

 

Figure 17: Engaged/disengaged position for quick attach lock assembly 

 

4.  Lower the front of the machine until the hooks 

are clear the machine lock pins. 

-To lower the front end of the machine, turn 
air-dump valve on left-front leg and lower front 
airbags. 

 

Figure 18: Airdump valve

5.  Unhook the hydraulic, electrical, solution and foamer lines (if equipped), being careful not to leave the 

ends in a place that they may get damaged or contaminated. 

*Make sure the solution valves are OFF and engine is turned OFF before disconnecting any hoses or 
electrical lines.  

     

   

  

 

 

Figure 19: Connect electrical and solution on RH side 

                     

Содержание 12 Row NTB

Страница 1: ...NED WITHIN THIS OPERATOR S MANUAL THAT DEPICT SHIELDS GUARDS RAILS OR LIDS REMOVED ARE FOR DEMONSTRATION ONLY HAGIE MANUFACTURING STRONGLY URGES THE OPERATOR TO KEEP ALL SHIELDS AND SAFETY DEVICES IN...

Страница 2: ...MANUFACTURING COMPANY 721 CENTRAL AVENUE WEST BOX 273 CLARION IOWA 50525 0273 515 532 2861 COVERS MACHINE SERIAL NUMBERS U6911201001 through U6911201100 U6921201001 through U6921201100 U6951201001 thr...

Страница 3: ...in top running condition We have attempted herein to cover all of the adjustments required to fit varied conditions However there may be times when special care is needed Hagie Manufacturing Company...

Страница 4: ...sale this manual should accompany the unit If you do not understand any part of the manual or require additional information or service contact the Hagie Customer Support Department Hagie Manufacturin...

Страница 5: ...TION i TABLE OF CONTENTS iii SAFETY 1 DECALS 5 SPECIFICATIONS 6 OPERATING INSTRUCTIONS UNFOLD 11 APPLICATION SYSTEM 13 OPERATING INSTRUCTIONS FOLD 15 ATTACHMENT SYSTEM 17 TRANSPORTING 21 SERVICE 22 ST...

Страница 6: ...afely Likewise do not let anyone operate without instruction Do not make modifications such as weldments add ons adaptations or changes from the original design of attachment Such changes and or modif...

Страница 7: ...e fitting clothes that could get caught in moving parts Wear safety equipment that is appropriate for the job Do not store chemical soaked clothes in the cab Clean off as much mud and dirt from your s...

Страница 8: ...id torching welding and soldering near pressurized hydraulic lines Pressurized lines may accidentally burst when heat goes beyond the immediate flame area _____________________________________________...

Страница 9: ...y chemical containers properly Wash spilled chemicals or residue away to prevent corrosion and deterioration Select safe areas to fill flush calibrate and clean sprayer where chemicals will cause cont...

Страница 10: ...necessary Following are locations of important safety decals Replace them if they are torn or missing All warning decals and other instructional Hagie decals may be purchased through Hagie Customer Su...

Страница 11: ...uge x x x x HAGIE MANUFACTURING Company offers its NTB nitrogen toolbar in 12 row 16 row 18 skip row and 24 skip row configurations In either case the 6 ft clearance allows growers to side dress nitro...

Страница 12: ...diagram above shows the 30 foot toolbar used for Hagie s 12 row nitrogen toolbar Toolbar fold points are specified by the red arrows and pictured below in Figure 1 Figure 1 Folded position for 12 row...

Страница 13: ...8 SPECIFICATIONS Figure 2 shows the 18 skip row nitrogen toolbar used on the 30 foot toolbar Figure 2 Folded position for 18 skip row NTB...

Страница 14: ...ve shows the 40 foot toolbar used for Hagie s 16 row nitrogen toolbar Toolbar fold points are specified by the red arrows and pictured below in Figure 3 Figure 3 Folded position for 16 row NTB 16 ROW...

Страница 15: ...10 SPECIFICATIONS Figure 4 shows the 18 skip row nitrogen toolbar used on the 40 foot toolbar Figure 4 Folded position for 24 skip row NTB...

Страница 16: ...entire lift arm with attachment pushing up on RAISE control on hydrostatic handle Figure 7 shows how to raise and lower each toolbar arm using BOOM controls on hydrostatic handle o Push up to RAISE o...

Страница 17: ...trols to the OUT position on the hydrostatic handle Figure 8 4 Unfold secondary toolbar tip if 40 toolbar is equipped using side console BOOM EXT 80 90 100 switch Figure 9 Hold down OUT until toolbar...

Страница 18: ...is not designed to replace the Raven manual and numbers used may not reflect your specific situation Read all manuals before operating the equipment Spray System Please refer to Operator s Manual equi...

Страница 19: ...ain spray power Figure 11 Master spray switch 7 Place the individual boom solution valve switch or switches for the NTB to the ON position Number of sections will depend on number of section valves on...

Страница 20: ...m with attachment pushing up on RAISE control on hydrostatic handle Figure 7 shows how to raise and lower each toolbar arm using BOOM controls on hydrostatic handle o Hold up to RAISE o Hold down to L...

Страница 21: ...OOM EXT 80 90 100 switch Figure 13 Hold down IN until toolbar tip is completely folded in Figure 14 4 Fold nitrogen toolbar arms in holding BOOM controls to the IN position on the hydrostatic handle F...

Страница 22: ...ware of the room that is needed for the attachment and adequate space to travel around it safely If you are storing the boom in a building make sure that you have adequate room around it to safely pas...

Страница 23: ...e front of the machine until the hooks are clear the machine lock pins To lower the front end of the machine turn air dump valve on left front leg and lower front airbags Figure 18 Airdump valve 5 Unh...

Страница 24: ...be installed Be sure to unlock quick attach when installing an attachment 7 Start the machine and slowly back away from the attachment Alarms may sound notifying you of modules being offline but accep...

Страница 25: ...air dump valve on left front leg to fill front airbags See Figure 21 Make sure attachment hooks lock onto lock pins and quick attach holes line up 6 Turn the engine OFF 7 Engage quick attach lock asse...

Страница 26: ...mmends only driving the machine for transporting Loading a machine on a trailer may result in an accident and or damage to the machine NEVER operate the machine on a public roadway with solution in th...

Страница 27: ...rk at toolbar tip fold 10 hours or daily whichever comes first 500 hours or yearly whichever comes first Grease point C ONLY for 40 NTBs Figure 23 40 ft toolbar has 6 grease points A B C 3 per side 30...

Страница 28: ...23 SERVICE Figure 25 Grease point B grease point inside fold Figure 26 Grease point C grease point on outer fold...

Страница 29: ...ocedures for the monitor and flow meters 5 Thoroughly wash the boom and touch up any chipped or damaged paint For touch up paint recommendations contact Hagie Customer Service 6 Replace any damaged or...

Страница 30: ...ne tune ups adjustments inspections nor any consumables such as tires rubber products solution system valves wear parts wiper blades etc Hagie Manufacturing Company shall not be responsible for repair...

Страница 31: ...ine Fold the Nitrogen Toolbar 13 G Grease point 22 H I J K L M N O P Q Quick attach lock assemblies 18 20 R Rinse system See Operator s Manual for machine S Service iii 22 23 Solution system See Opera...

Отзывы: