- 5 -
manual and be fully acquainted with all the details.
3.1.2 The operater should be familiar with all the rules and
points of attention of running and maintaining the machine.
3.1.3Remove all the anti-rust coating or grease from the
machine .
3.1.4 There’s a reliable ground protection the ground wire
must be connected properly before it in operation.
4.Lubrication
Lubricate the sliding and rotating part before trial run.
Pour NO.40 machine oil into the Gear Box and power
Feed(optional).Till indicating through the oil level indicators
then do a overall check.
Keep oil lever above the mark.
Page 6
Instruction Manual for HM-51B (M577)
25/03/2019
Содержание HM-51B
Страница 20: ... 19 PARTS DIVISION AND PARTS LIST A COLUMN PARTS Page 20 Instruction Manual for HM 51B M577 25 03 2019 ...
Страница 22: ... 21 B Rotary table optional Page 22 Instruction Manual for HM 51B M577 25 03 2019 ...
Страница 24: ... 23 C Belt Head Page 24 Instruction Manual for HM 51B M577 25 03 2019 ...
Страница 28: ... 27 Page 28 Instruction Manual for HM 51B M577 25 03 2019 ...
Страница 29: ... 28 DRILLING MILLING MACHINE QUALITY CERTIFICATE Page 29 Instruction Manual for HM 51B M577 25 03 2019 ...