NOTICE!

 

The limit switch function will only work if the movement direction of the load (lifting - lowering) corresponds 
to the push buttons of the control switch. 

 

12 

Maintenance 

 

 

12.1 

General 

All  monitoring,  servicing  and  maintenance  operations  are  to  ensure  correct  functioning  of  the  equipment; 
they must be effected with utmost care. 

  Only 

“qualified persons” may do this work. 

  Servicing and maintenance work must only be done when the hoist is not loaded. 

  Records must be kept of all test results and measures taken. 

 

12.2 

Monitoring 

The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift 
operation.  In  case  of  severe  operating  conditions  (e.g.  frequent  operation  with  full  load)  or  special 
environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly  

 

 

12.3 

Replacing the load chain 

   

VORSICHT!

 

If  there  is  any  visible  damage  and  when  the  conditions  for  replacement  are  reached  (i.e.  one  or  several 
dimensions in the table have been reached, there is corrosion or elongation), the chain must be replaced.  

When replacing the chain, also check the chain wheels. 

Procedure: 

  Only insert new chains in an unloaded state. 

 

  Remove chain from its fastening at the end and attach a chain link which is open at the side. 

 

  A chain link which is open at the side, can easily be 

produced by grinding out a small piece. The opening 
must have the same thickness as the chain link. 

 

Illustration 12               

 

  Hang a new original chain (same size and oiled) in the side opened chain link and insert it. 

NOTICE! 

The weld seam of the chain must be on the outside.

 

 

 

Illustration 13

     

 

 

  Make sure the chain is not installed twisted. 

  Make sure the chain links are aligned in one direction. 

 

  Assemble the chain to the end fastening. 

 

 

Running of the chain into the chain container: 

  Always run chains into the chain container by using the motor.  

   

CAUTION!

 

Fill in the chain always motor driven. 

Never run the chain in by hand, as there is a risk of knotting which can cause malfunctions and damage to 
the device. 

 

 

 

 

Содержание 62/05 S

Страница 1: ...Electric Chain Hoist 62 05 stationary with suspension eye or hook S with monorail push travel trolley R with monorail hand geared trolley H with monorail electric trolley E Installation Operating and...

Страница 2: ...e life 4 2 Safety 4 2 1 Warning notice and symbols 4 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 5 2 4 Appropriate use 5 2 5 Basic safety measures 6 3 Transport and St...

Страница 3: ...ucts meet European Union requirements in particular the valided EU Machine Directive The entire company works acc to a certified quality assurance system as per ISO 9001 The production of components a...

Страница 4: ...GER Failure to follow the instructions of this manual can lead to unpredictable hazards For any resulting damage or personal injury HADEF assumes no liability The unit was designed and built following...

Страница 5: ...ntenance work DANGER In order to avoid severe injury please pay attention to the following when using the equipment Use protective clothes equipment Do not wear long hair hanging down open Do not wear...

Страница 6: ...onsible supervisor immediately If the unit is put into motion any persons in the immediate vicinity must be informed by calling to them Please pay attention to the regulations for load carrying device...

Страница 7: ...n parking position If the device is set up in a continuously humid environment with strong temperature fluctuations the correct functionings are endangered by the forming of condensation During longer...

Страница 8: ...on against functional failures in case of extreme environmental impact is the regular use of the equipment If the hoist is not used very often we recommend to carry out a test run at least once a week...

Страница 9: ...ff the device if phase failure occurs In addition all devices with low voltage control are equipped with thermal sensors to protect the lifting motor and end switches for lifting lowering as a standar...

Страница 10: ...om the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs depended on type leave a distance for the load hook It is important that the load...

Страница 11: ...lief cable 4 Connector plug 5 Locking clips Unscrew the locking screw 1 incl the retaining plate 2 Screw the strain relief cable 3 behind the retaining plate 2 tightly to the casing with the locking s...

Страница 12: ...n 8 System start optional Illustration 9 Push button functions E Relieved push button stand still push button half pushed slow speed push button pushed completely fast speed Illustration 10 Red Emerge...

Страница 13: ...ecifications in the test book During operation the nominal load of the unit must not be exceeded 9 Commissioning 9 1 General The operator of the unit is responsible for the entire system According to...

Страница 14: ...ial number 9 2 5 Assignment recommendation of line cross sections and fuses Assignment of line cross sections and fuses must be done acc to VDE0100 For total motor output add all motor output data The...

Страница 15: ...for lifting If desired the chain hoist can be fitted with a limit switch for lifting GTES 51 67 or GTES 51 180 It allows to adjust any switching point desired for example the limit positions of upper...

Страница 16: ...service initially or when putting back into service it must be checked whether All fastening screws if existent socket pins flap socket and safety devices are tightened and secured The oil levels in t...

Страница 17: ...and when the conditions for replacement are reached i e one or several dimensions in the table have been reached there is corrosion or elongation the chain must be replaced When replacing the chain al...

Страница 18: ...ain Tightening torque of screws for bottom block M5 10 9 8Nm M6 10 9 15 Nm Illustration 15 2 fall version 2 1 put the chain through the bottom block more and more fix the last chain link with bolt 4 a...

Страница 19: ...anchor plate 10 using a feeler gauge until nominal air gap a is reached see table 4 Unscrew the cap screws 8 from the magnetic body clockwise 5 Tighten the locking screws 6 6 Check the air gap again...

Страница 20: ...These conditions have to be written down in the test book The owner user is responsible to make sure that these conditions are observed 13 2 Periodic checks Independently from the regulations of the i...

Страница 21: ...or deformation the chain must be replaced 13 4 Checking the load hook Load hook X measuring distance hook mouth width Y measured length from hook no 6 H thickness of hook saddle Illustration 23 Dimen...

Страница 22: ...tal influences that foster wear such as sand a dry lubricant should be used e g graphite powder When lubricating the chain s condition of wear should be checked CAUTION Do not use grease for lubricati...

Страница 23: ...6 320 Renolin PG 460 Omala S4 WE 460 Glygolube 460 Degol GS 460 Glygoyle 460 Alphasyn PG 460 Kl bersynth GH 6 460 Renolit FEP2 Alvania EP2 Unirex EP2 Mobilux EP2 MULTIS EP2 Renolin B10 VG32 Tellus Oi...

Страница 24: ...manufactuerer for repair Rotor is rubbing Brake does not release See problem Brake does not release Defect of capacitor only for alternating current 1 Replace the capacitor Defect of starter relay on...

Страница 25: ...all operating material is disposed of in accordance with environmental regulations 17 1 Temporary decommissioning Measures are as above Also read the chapter Transport and storage 17 2 Final decommiss...

Отзывы: