5.52.179.00.01.09
13
6.4
Chain container installation
The chain container is supplied as a complete
unit. For the installation of the chain container, the
following must be observed:
Mount chain container (1) with screws (2) in
the position provided (3).
Let the load chain run smoothly into the chain
container (1).
The holding chain (4) which is already fixed to
the chain container must be fastened with
screw (6) at the position provided therefore at
the hoist (5) in such a way that the chain
container (1) hangs as horizontally as possible,
to achieve this, either shorten the holding chain
(4) or another chain link must be added to the
holding chain (4).
Re-check the fastening screws.
Check whether the load chain of the device
can enter the chain container freely by carrying
out a functional test without load.
Illustration 4
i The chain container should hang horizontally or
as horizontally as possible
1 chain container
2 screws
3 position for screws
4 holding chain
5 position of holding chain
6 screw