5.52.145.00.01.05 

 

 

 

   

CAUTION!

 

Run in of chain into the chain container for hoist with double lifting mechanism 

For a correct run in of chain into both chain containers, the lowering operation must be carried out, without 
load, at certain intervals, until both chain container are empty. 

 

For motorized devices with operating limit switches "lowering" 

Lower until the operating limit switch is released. 

 

Non-observance can lead to device damages! 

 

 

   

WARNING!

 

The hoist must always hang centrally under the beam or under its suspension point. 

 

Monorail push travel trolleys are moved by pushing the load. 

Monorail hand geared trolleys are moved by pulling the hand chain. 

 

7.1 

Brake and pawl  

The brake system needs a minimum load of 3% of the capacity. 

Only  this  minimum  load  makes  sure  that  the  load-pressure-brake  closes  correctly.  When  the  brake  closes 
correctly, the load is safely held 

   

GEFAHR!

 

Working situations with no guarantee that the minimum load is charged, are forbidden! 

 

Commissioning 

 

8.1 

General 

Should the unit be used in Germany:  

Please observe the validated, national accident prevention regulations. 

For other countries:  

Inspections as above. Please observe the national rules and regulations and the instructions in this manual! 

 

 

 

NOTICE!

 

Hoists up to 1000 kg capacity and without motor-

driven trolleys of hoisting unit must be tested by a “qualified 

person” before putting into operation for the first time. 
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley 
movement, must be tested by a “licensed qualified person” before putting in operation. 
An  exception  is 

“hoists  ready  for  operation”  acc.  validated  national  regulations  with  EU-declaration  of 

conformity. 

Definition “qualified person” (former expert) 

A “qualified person” has learned, due to occupational training and experience and the job that the person has 
done, the skills needed to tests the material for one’s work. 

Definition “licensed qualified person” (former approved expert) 

A “licensed qualified person” has, due through special occupational training, knowledge about testing of the 
material for one’s work and knows the national accident prevention regulations and other prescriptions and 
technical regulations. This person must test the material for one’s work regularly with regard to design and 
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS). 

 

8.2 

Load chain 

  Before commissioning the load chain must be aligned and oiled. 

  For the first commissioning of motorized hoists, chain oil is supplied with the delivery. 

  Move safety note and fixing wire away from the chain. 

 

 

Содержание 240/12

Страница 1: ...lation o by Heinrich de Fries GmbH Heinrich de Fries GmbH Gauss Str 20 D 40235 D sseldorf Heinrich De Fries GmbH will be named HADEF in the following text Original operating and maintenance instructio...

Страница 2: ...al data 8 6 Installation 8 6 1 Trolley 8 6 2 Adjusting the gauge 8 6 3 Installation on the beam 9 6 4 Tools 9 7 Control 9 7 1 Brake and pawl 10 8 Commissioning 10 8 1 General 10 8 2 Load chain 10 9 Sa...

Страница 3: ...during transport Report any damage immediately to the forwarding agent This manual allows a safe and efficiently use of equipment Images of this manual are for a principle understanding and can be dif...

Страница 4: ...ey are legible and complete The unit is only operated serviced and repaired by qualified and authorized personnel This personnel is regularly trained in all applicable matters regarding safety at work...

Страница 5: ...manual Observe safety distances Take care for a free view on the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons...

Страница 6: ...he following is not allowed to lift another load than the nominal safe working load to manipulate the sliding clutch if units are equipped with The use of elongated or damaged chains or wire ropes Rep...

Страница 7: ...A load pressure brake prevents automatic lowering of the load after releasing the hand chain In combination with hand geared trolleys the trolley is moved to the left or to the right side by pulling t...

Страница 8: ...6 6 Installation The assembly and installation depends on the local environment The hoist must be suspended in a way that it can position itself freely 6 1 Trolley For assembly on a beam a travel limi...

Страница 9: ...mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operation of the lift...

Страница 10: ...in this manual NOTICE Hoists up to 1000 kg capacity and without motor driven trolleys of hoisting unit must be tested by a qualified person before putting into operation for the first time Hoists of 1...

Страница 11: ...ctions initially without a load Then check the brake function under load The load must be securely held Trolleys Carefully move the trolley to the end positions and check the positions of the end stop...

Страница 12: ...anged by a new original part on commissioning daily checks 1st maintenance after 3 months Inspection Maintenance every 3 months Inspection Mainte nance every 12 months Check screw connections X X Chec...

Страница 13: ...ons listed in the table are reached due to wear or deformation the chain must be replaced 12 3 Checking the load hook Load hook X measuring distance hook mouth width Y measured length from hook no 6 H...

Страница 14: ...ient to lubricate the chain from the outside as this will not ensure the formation of a lubricating film within the links The adjacent link points must always be lubricated to prevent excessive wear I...

Страница 15: ...e 13 6 Gear spring pressure brake During the check brake lining wear is verified The brake linings must be replaced when the wear limit is already reached at one position of the lining as this can be...

Страница 16: ...ntenance lubricate chains gear and chain wheels Defect of chain gear or chain wheels Do maintenance and replace defective parts by original spare parts Load is lifted with interruptions Pawl spring is...

Страница 17: ...e as above Also read the chapter Transport and storage 16 2 Final decommissioning disposal Measures are as above After disassembly ensure that the disposal of the equipment and any materials it contai...

Отзывы: