background image

 

5.52.145.00.01.05 

Rev.05 

 

 

 

 

 

 

 

 

 

 

HADEF Spur Gear Hoist 

 

Type 240/12 

 

 

 

with monorail push travel trolley 

HR 

 

 

with monorail hand geared trolley 

HH 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTICE!

 

The installation or mounting instructions for incomplete 

machines you’ll find in chapter “Installation” 

 

 by Heinrich de Fries GmbH 

 

Heinrich de Fries GmbH, Gauss Str. 20, D-40235 Düsseldorf 

 

Heinrich De Fries GmbH will be named HADEF in the following text. 

Original operating- and maintenance instructions in German language. 

Translation in other languages is made of the German original.  

A copy may be requested in writing or is available for download o

www.hadef.com

  

Subject to changes. 

 

 

Installation, Operating and  
Maintenance Instructions 

Содержание 240/12

Страница 1: ...lation o by Heinrich de Fries GmbH Heinrich de Fries GmbH Gauss Str 20 D 40235 D sseldorf Heinrich De Fries GmbH will be named HADEF in the following text Original operating and maintenance instructio...

Страница 2: ...al data 8 6 Installation 8 6 1 Trolley 8 6 2 Adjusting the gauge 8 6 3 Installation on the beam 9 6 4 Tools 9 7 Control 9 7 1 Brake and pawl 10 8 Commissioning 10 8 1 General 10 8 2 Load chain 10 9 Sa...

Страница 3: ...during transport Report any damage immediately to the forwarding agent This manual allows a safe and efficiently use of equipment Images of this manual are for a principle understanding and can be dif...

Страница 4: ...ey are legible and complete The unit is only operated serviced and repaired by qualified and authorized personnel This personnel is regularly trained in all applicable matters regarding safety at work...

Страница 5: ...manual Observe safety distances Take care for a free view on the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons...

Страница 6: ...he following is not allowed to lift another load than the nominal safe working load to manipulate the sliding clutch if units are equipped with The use of elongated or damaged chains or wire ropes Rep...

Страница 7: ...A load pressure brake prevents automatic lowering of the load after releasing the hand chain In combination with hand geared trolleys the trolley is moved to the left or to the right side by pulling t...

Страница 8: ...6 6 Installation The assembly and installation depends on the local environment The hoist must be suspended in a way that it can position itself freely 6 1 Trolley For assembly on a beam a travel limi...

Страница 9: ...mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operation of the lift...

Страница 10: ...in this manual NOTICE Hoists up to 1000 kg capacity and without motor driven trolleys of hoisting unit must be tested by a qualified person before putting into operation for the first time Hoists of 1...

Страница 11: ...ctions initially without a load Then check the brake function under load The load must be securely held Trolleys Carefully move the trolley to the end positions and check the positions of the end stop...

Страница 12: ...anged by a new original part on commissioning daily checks 1st maintenance after 3 months Inspection Maintenance every 3 months Inspection Mainte nance every 12 months Check screw connections X X Chec...

Страница 13: ...ons listed in the table are reached due to wear or deformation the chain must be replaced 12 3 Checking the load hook Load hook X measuring distance hook mouth width Y measured length from hook no 6 H...

Страница 14: ...ient to lubricate the chain from the outside as this will not ensure the formation of a lubricating film within the links The adjacent link points must always be lubricated to prevent excessive wear I...

Страница 15: ...e 13 6 Gear spring pressure brake During the check brake lining wear is verified The brake linings must be replaced when the wear limit is already reached at one position of the lining as this can be...

Страница 16: ...ntenance lubricate chains gear and chain wheels Defect of chain gear or chain wheels Do maintenance and replace defective parts by original spare parts Load is lifted with interruptions Pawl spring is...

Страница 17: ...e as above Also read the chapter Transport and storage 16 2 Final decommissioning disposal Measures are as above After disassembly ensure that the disposal of the equipment and any materials it contai...

Отзывы: