12
Installation
Figure 2
Panel Mounting Dimension
3.2 Preparing for System Measurement
1.
Remove the measurement chamber (see
Figure 1 on page 9
).
2.
Remove the protective cap covering the electrode bulb and rinse with demineralized
water or pH buffer for pH measurement or ORP standard solution for ORP
measurement. Save the protective cap if the electrode will be stored for long
periods of time.
3.
Replace the measurement chamber.
Содержание 8362sc
Страница 2: ...Visit http www hach com...
Страница 6: ...Visit us at www hach com...
Страница 10: ...Visit us at www hach com...
Страница 14: ...14 Installation Figure 3 Measurement System Electrical Connection to Digital Gateway...
Страница 16: ...Visit us at www hach com...
Страница 31: ...31 sc100 Operation Figure 8 Overflow Sampling...
Страница 47: ...47 sc1000 Operation Figure 16 Overflow Sampling...
Страница 50: ...Visit us at www hach com...
Страница 52: ...Visit us at www hach com...
Страница 54: ...Visit us at www hach com...
Страница 58: ...Visit us at www hach com...