Hach 5410001 Скачать руководство пользователя страница 22

1.

Discard the old containers with remaining contents in compliance with MSDS and regulatory
requirements.

2.

Install the new bottles. Refer to 

Install the buffer solution

 on page 15 and 

Install the indicator

solution

 on page 15.

8.6 Change the alarm trip point

Install the applicable buffer and indicator solution to change the alarm trip point to a different
hardness level. Let the instrument operate for 2 hours to purge the used reagents. Calibrate the
instrument again. Refer to 

Trip point specifications

 on page 4 and to 

Calibration

 on page 18.

8.7 Replace the pump tubes

Over a period of time, the clamping action of the pump/valve module will soften the tubing. This
causes the tubing to break and prevents liquid flow. Leaks can occur. The tubing wear is increased at
high temperatures. Therefore, the pump tube replacement schedules are based on the ambient
operating temperature. Refer to 

Maintenance schedule

 on page 19 for the maintenance interval.

Refer to the documentation supplied with the maintenance kit.

8.8 Replace the tubing

The manufacturer recommends that one tube is replaced at a time. Refer to the documentation
supplied with the maintenance kit.

8.9 Clean the colorimeter

W A R N I N G

 

Chemical exposure hazard. Obey laboratory safety procedures and wear all of the
personal protective equipment appropriate to the chemicals that are handled. Refer to
the current safety data sheets (MSDS/SDS) for safety protocols.

The colorimeter measuring cell can collect sediment or cause layers to grow on the inside walls.
Clean the cell with an acid solution and a cotton swab on a monthly basis.

Items to collect:

• Sulfuric acid standard solution, 19.2 N, 100 mL MDB
• Wooden or paper cotton-tipped swab
• Bent steel paper clip
• Stir bar (optional)

1.

Remove the plug from the top port of the colorimeter. Refer to 

Figure 13

 on page 16.

2.

Remove the magnetic stir bar with a bent steel paper clip as a retrieval tool.

3.

Use the pipette to add 2–3 drops of 19.2 N sulfuric acid standard solution in the colorimeter.

Note: Lower normality sulfuric acid is not sufficient to clean the colorimeter.

4.

Let the sulfuric acid stay in the colorimeter for 15 minutes.

5.

Use a wooden or cotton-tipped swab to clean the interior surfaces of the colorimeter cell. Move
the cotton-tipped swap gently up and down.

Note: Do not use a plastic swab to clean the colorimeter with sulfuric acid. The acid will dissolve the plastic.

6.

Make sure that the measurement cell is dry.

7.

Clean the stir bar with water or alcohol or replace the stir bar.

8.

Replace the plug in the top port of the colorimeter.

8.10 Replace the sample conditioning filter

Examine the sample conditioning filter regularly when lots of solids are in the sample. Replace the
sample conditioning filter if necessary. Refer to 

Maintenance schedule

 on page 19 for the

maintenance interval. Refer to the documentation supplied with the installation kit.

20

   

English

Содержание 5410001

Страница 1: ...DOC023 53 80422 SP 510 03 2022 Edition 13 User Manual...

Страница 2: ......

Страница 3: ...Electrical connections for conduit 13 3 3 3 Wiring for power 14 3 3 4 Select the voltage 14 3 3 5 Connect the alarm relays 14 3 4 Install the buffer solution 15 3 5 Install the indicator solution 15...

Страница 4: ...8 11 Replace the fuse 21 Section 9 Troubleshooting 21 9 1 Troubleshooting for a hard reading 22 Section 10 Replacement parts and consumables 23 Index 25 Table of Contents 2...

Страница 5: ...ter alarm transition One reading below the trip point is necessary to trigger a hard to soft water alarm transition Trip point 0 3 1 2 5 10 20 50 and 100 mg L Refer to Trip point specifications on pag...

Страница 6: ...0 60 mg L per C Section 2 General information In no event will the manufacturer be liable for direct indirect special incidental or consequential damages resulting from any defect or omission in this...

Страница 7: ...mbol to avoid potential injury If on the instrument refer to the instruction manual for operation or safety information Electrical equipment marked with this symbol may not be disposed of in European...

Страница 8: ...e the user will be required to correct the interference at their expense The following techniques can be used to reduce interference problems 1 Disconnect the equipment from its power source to verify...

Страница 9: ...Indicator and reagent bottles 4 Air purge optional 10 Sample inlet 5 Access cover 11 Enclosure drain 6 Colorimeter 12 Sample drain 2 3 Product components Make sure that all components have been receiv...

Страница 10: ...qualified personnel must conduct the tasks described in this section of the document 3 1 Install the instrument Install this instrument on an indoor wall away from direct sunlight For a complete purge...

Страница 11: ...Figure 3 Dimensions for wall installation Figure 4 Door clearance English 9...

Страница 12: ...e off of the connector when water pressure is applied Note The sample drain connector will install on inch ID flexible tubes customer supplied 3 2 1 Connect the air purge optional An air purge is nece...

Страница 13: ...he pump tubes before installation Make sure to turn the screws in small increments and move from one screw to the other so that the plate is pulled down equally Do not overtighten To install the press...

Страница 14: ...oint 8 Low flow valve option 3 Drainage flow 6 Filtered sample bypass ball valve shown open 9 High flow valve option 3 3 Electrical installation D A N G E R Electrocution hazard Always remove power to...

Страница 15: ...ain power source W A R N I N G Electrocution hazard Install a 10 A circuit breaker for mains power Identify the circuit breaker with a label as a local disconnect for this equipment The instrument has...

Страница 16: ...strument is set to 115 volt operation at the factory To change the line voltage to 230 volt operation slide the voltage switch to the 230 V position Refer to Figure 10 on page 14 Note The fuses are ap...

Страница 17: ...nal block Terminal 1 Terminal 2 Terminal 3 J7 COM Normally open NO Normally closed NC 3 4 Install the buffer solution Buffer solutions are formulated at the factory and are ready to install without pr...

Страница 18: ...stir bar A stir bar is included in the installation kit Install the stir bar in the colorimeter sample cell for correct operation Refer to Figure 13 Figure 13 Install the stir bar Section 4 User inter...

Страница 19: ...to Install the pump valve pressure plate on page 11 1 Open the supply valve to the instrument 2 Let the pressure in the tubes stabilize Note If leaks occur under pressure examine all connections Secu...

Страница 20: ...steps 2 4 again 6 Push ZERO CAL The zero cal LED is on continuously 7 When the zero cal LED flashes add two drops of EDTA Solution 10 g L into the colorimeter 8 When the LED stops flashing and is on c...

Страница 21: ...otective equipment appropriate to the chemicals that are handled Refer to the current safety data sheets MSDS SDS for safety protocols Refer to the MSDS for instructions to safely clean reagent spills...

Страница 22: ...are handled Refer to the current safety data sheets MSDS SDS for safety protocols The colorimeter measuring cell can collect sediment or cause layers to grow on the inside walls Clean the cell with a...

Страница 23: ...es if necessary The SOFT LED light is not on and the pump motor does operate Problem with the power supply Replace the main circuit board Contact technical support The SOFT LED light is on but the pum...

Страница 24: ...block and cause the color to be diluted Make sure to set the flow rate to 200 mL minute The sample line is pinched off in the pinch block Pull the sample line from the colorimeter Water that is alrea...

Страница 25: ...ent reads hard again Section 10 Replacement parts and consumables W A R N I N G Personal injury hazard Use of non approved parts may cause personal injury damage to the instrument or equipment malfunc...

Страница 26: ...10 g L 1 oz 102133 Magnesium standard solution dropping bottle 10 g L 1 oz 102233 SP510 Hardness Monitor indicator solution for 25 ppm 500 mL 2502749 SP510 Hardness Monitor indicator solution for 50 p...

Страница 27: ...2 Colorimeter 20 D Dimensions 8 F Fuse 21 H Hard calibration 18 Hard reading 22 I Indicator solution 15 K Keypad 16 N Navigation 16 P Pressure plate 11 R Reagent 15 19 Reagent line 22 Relay 14 S Sampl...

Страница 28: ......

Страница 29: ......

Страница 30: ...h com www hach com HACH LANGE GMBH Willst tterstra e 11 D 40549 D sseldorf Germany Tel 49 0 2 11 52 88 320 Fax 49 0 2 11 52 88 210 info de hach com www de hach com HACH LANGE S rl 6 route de Compois 1...

Отзывы: