13
Installation
Figure 7
Tightening the Membrane
3.5.1.1 Placing the Probe Into the Flow Thru Assembly
1.
Remove the probe retaining nut (
2.
Insert the newly assembled probe into the right chamber of the flow cell.
3.
Gently screw the retaining nut back on, ensuring it is snug but do not overtighten.
4.
Attach the keyed electrode.
1.
Displays the correct way to tighten the membrane. It is
snug but not overtightened.
2.
Displays the incorrect way to tighten the membrane. It is
too loose and the internal electrolyte could leak.
Содержание 9185sc
Страница 2: ...HACH LANGE GmbH 2005 2013 All rights reserved Printed in Germany...
Страница 10: ...8 General Information...
Страница 20: ...18 Installation...
Страница 28: ...26 Operation...
Страница 32: ...30 Troubleshooting...
Страница 38: ...36 Warranty liability and complaints...
Страница 42: ...40 9185sc Theory of Operation...
Страница 44: ...42 9187sc Theory of Operation...
Страница 48: ...46 Modbus Register Information...
Страница 50: ...48 Index...