Step 3.
E (M6x15) 2x
F (M6)
2x
G(M6)
2x
H(M6)
2x
◆
purpose.
◆
Lay out the middle slide chute (L) and bottom slide chute (M) on the side as figure shown.
◆
joint firmly, ensure the connection are perfect , so that the two chutes meet closely
and there is no gap between the chutes.
◆
(bolt Ex1 + washer Fx1 + spring washer Gx1 + domenut Hx1).
◆
Leave the lower screw hole of middle and bottom slide chute unassembled.
Step 4.
◆
◆
Lay out the top slide chute (K) and middle slide chute (L) on the side as figure shown.
◆
joint firmly, ensure the connection are perfect , so that the two chutes meet closely
and there is no gap between the chutes.
Top and middle slide chutes have tongue-and-groove joint on the edge for connection
purpose.
◆
Top Slide chute (K) with rounded-edge.
Connect the top slide chute (K) and middle slide chute (L) by embedding tongue-and-groove
Connect the middle slide chute (L) and bottom slide chute (M) by embedding tongue-and-groove
Middle and bottom slide chutes have tongue-and-groove joint on the edge for connection
Only thread the upper screw hole of middle and bottom slide chute with the hardware
L
K
M
L
K
M
M
L
Upper
Rounded-edge