i
EN
Complete the circle, line up the holes in the two ends oft he pool wall and
join the ends with a bolt and nut through each head. The head oft he bolts
must be on the inner surface oft he wall, and the wash- ers and nuts on the
outer surface. There are two lines of holes on the wall. It is important that
each hole has a screw (except the last one), otherwise, the pool could
break when filling. Recheck all of the base plates to make sure each one
are centered where the base rails meet. Even make sure, that all lower
profiles are set correctly. Now you may cut to measure the last section with
a hacksaw. For this you only just need to lift the steel wall a little bit. Also do
not for- get the plastic connectors. Figure 14
Using a strip of PVC 2 (not included in delivery), cover the bolt heads on the
inside of the pool wall to protect the liner from rubbing against objects,
which is the main cause of tears in the liner. This tape must adhere firmly, if
it’s necessary, use PVC glue. Stick the strip with glue for PVC to insure that
for instance the screws are completely covered before moving on to the
next step. Figure 15
Make sure that the swimming pool is completely circulare.
If you use no floor insulation
Cover the inside bottom border of the circle using clean thin sifted sand free
of any stones or foreign objects with a height of 1 - 2 cm and condense this.
Press the sand into a vertical triangular shaped layer that covers the
sections and the inside part of the metal wall. The height of this triangular
layer must be around 7 cm. In this way, you will prevent the liner from
sliding under the metal wall and being damaged due to the pressure and
the weight of the water. To prevent the sand from escaping you should fit an
additional plastic foil along the pool floor.
Figure 17 & 18
1) chamfer
2) tape
3) platic film
4) steel jacket
Here you can use our optional Styrofoam wedges. These are glued with an
adhesive force on the round floor insulation along the pool wall.
Alternatively you can, however, make a furrow of sand, as described
above.
Independent of which of the two possibilities you choose, you have to apply
to the floor insulation and the fillet a swimming fleece because otherwise
the bottom of the pool liner insulation deprives the plasticizers, the film
becomes brittle and thus significantly reduces the lifetime. In addition, if
using the variant with sand, the inner foil is protected.
The liner used has been developed to withstand exposure to heat and
ultraviolet rays for a long period of time. Therefore, under certain climates
and conditions of use, the liner quality can vary slightly.
Never walk on the liner with shoes on!
The liner is the most important and delicate part of the swimming pool. Do
not use knives or any sharp objects to open the swimming pool
bag/container. Carefully separate the liner from the rest of the parts and
keep it in a safe place to avoid undesired holes or damag- es that could be
caused by the tools or the metal wall.
Install the liner on a sunny day, minimum 20º C, so that it can easily stretch
during the installation. It is made of a highly flexible vinyl ma- terial.
1.Place the liner (L) in the center of the swimming pool and unfold it
towards the sides. Place the rough side towards the inside of the pool. The
pool foil must be perfectly butted to the furrow and the wall. Figure 19
2.Lift the foil over the edge of the swimming pool and secure it using
clothes pegs, Remove the excess folds by lightly pulling the foil outwards
to adjust it. Pull the foil carefully, avoid too much tension. Figure 20
3.It is very important, that the liner is centered, well extended and not
wrinkled. Start filling the pool with water, but not more than 2-3 cm and
work out all the wrinkles and smooth the liner to the wall. Dont’t strech the
liner too much.
4.Insert the U-profiles around the edges of the pool now. After the U-
profiles are installed, cut the last profile to the appropriate length. Figure
22.
The profiles are connected using 2 plastic connectors, as with the floor
rails. Figure 11, 12.
5.After this the pool can be filled with water up to 10 cm below the rim and
install the mountable cartridge filter system.
At the end oft he swimming season, the pool should be removed and
stored dry. This also applies to the filter system. Damage caused by
freezing isn’t covered by warranty!
End of season
If you use floor insulation
Installation of floor rails
Содержание 1298 89171
Страница 1: ...Tobago 1298_89171...
Страница 10: ...i...