Setting Work and Tool Offsets
43
1.
Jog the X and Y Axes to the zero position established in the program.
F7.2:
UMC-750 X- and Y-Axis Zero Position
2.
Navigate to
[OFFSET]
>Work. Scroll to the work offset value used in the program
(
G54
in this example).
3.
Select the
X Axis
column of your work coordinate offset and press
[PART ZERO
SET]
to set the X-Axis zero position.
4.
Press
[PART ZERO SET]
again to set the Y-Axis zero position.
F7.3:
X-Axis Zero Position Set and Y-Axis Zero Position Set
5.
Determine a tool set plane to be used for setting all tool length offsets; for example,
use the top surface of the workpiece.
Содержание UMC-750
Страница 2: ......
Страница 10: ...viii ...
Страница 35: ...Introduction 19 F2 3 This diagram illustrates the 5 axes available on the UMC 750P A B B 45 45 ...
Страница 40: ...UMC 750P Specifications 24 ...
Страница 44: ...Coolant Tank Clean Out 28 ...
Страница 48: ...Machine Rotary Zero Point MRZP Offsets 32 ...
Страница 66: ...247 Simultaneous XYZ Motion in Tool Change 50 ...
Страница 72: ...56 ...