Haas Automation, Inc. | www.HaasCNC.com | 800-331-6746
5. Install the protective cover.
6. Connect the main power supply: 3-phase 220VAC
(ensure there is a proper ground connection)
What comes in the package
1. Main unit ×1 (guide rail and heating head)
2. Tool sleeves (as ordered)
3. Main power supply cable ×1
4. Spare fuse
5. Pickup springs: 4 mm ×2; 6 mm ×2; 8 mm ×2; 10 mm ×2
6. User’s Guide ×1