Haas Automation, Inc. | www.HaasCNC.com | 800-331-6746
HSF-325
USER’S GUIDE
HSF-325 Setting Up
1. Install the up/down guide rail. Fasten the rail to the base with the provided screws.
2. Attach the heating head to the holder on the guide rail, and connect the wires.
3. Connect the hose for the cooling air.
4. Install the toolholder sleeve.