Test
1
Operate this code in MDI mode:
For the ATT-4:
T1;
T2;
T3;
T4;
M99;
For the ATT-8:
T1;
T2;
T3;
T4;
T5;
T6;
T7;
T8;
M99;
Important:
Once clamped at each tool #,
verify that the load is always below 5%.
• Run the program for approximately 1
minute.
• Throughout the execution of the
program, verify proper clamping /
unclamping of the turret, and tool #
position as commanded by the
program.
• If it does not operate properly, ensure
that the parameters were set correctly
per the procedures above.
• If tool changes are correct, but loads are
above 5%, check the tool changer for
any mechanical binding.
TL-1/2 - ATT-4/8 Turret - Installation and Alignment - AD0304