8
96-0012 rev G
June 2003
O
M
PERATOR’S
ANUAL
A u t o m a t i c
A u t o m a t i c
A u t o m a t i c
A u t o m a t i c
P a l l e t C h a n g e r
P a l l e t C h a n g e r
Figure 3.4 Gaps A and B should be equal.
Figure 3.5 The APC lip should be centered
in the VMC drip trough.
10.
Attach the APC brace to the VMC and the APC with six screws (four 3/8" screws in the APC legs
and two 1" screws in the VMC base), but DO NOT TIGHTEN (see Figure 3.6). The VF-3 uses the
two holes in the brace that are closest to the VMC, while the VF-4 uses the two holes farthest
from the VMC.
Leveling Pad
Leveling Screw
APC Leg
APC Brace
3/8“SHCS (4)
VMC Base
HHB (2)
VF-4 Holes (2)
VF-3 Holes (2)
Figure 3.6 Installing the APC brace shown).
11.
In MDI mode, command an M14. The table will move to the pallet #1 load position. (The front right
corner of the VMC).
12.
Place the straightedge on top of the rollers of both the VMC receiver (unclamped) and the APC, to
check the APC height (see Figure 3.7). Make sure that the straightedge is on top of at least two
rollers on both the unclamped receiver and the APC in order to get an accurate reading. Adjust the
leveling screws in the APC legs until the straightedge lays completely flat on all rollers.
INSTALLATION