Installation: VF-12
1
Push POWER OFF.
Set the main circuit breaker to
the
OFF
position.
Lock the main circuit breaker. Use an
approved lock with an approved safety tag
For the VF 10 the worklight will be placed in
the location denoted as [1].
2
Start routing the cable to the top of the
machine [2], use the wire channels given in
the kit to neatly tuck away the cable as it is
being routed.
3
Once above the machine connect the
extension so that the work light cable will
now reach the connection area denoted as
[3].
The work light cable may be long enough to
meet the junction, if not use the extension
and neatly ziptie excess together.
Disconnect the inner LED cable and add the
splitter to the connection area [3]. Connect
the work light cable and reconnect the inner
LED light cable.
4
Actuate the light switch on the side of the
controller to test that the work light turns
on.
Table Work Light - Installation - AD0475
Page 5 of 6 pages