1
Push POWER OFF.
Set the main circuit breaker to the
OFF
position.
Lock the main circuit breaker. Use an approved
lock with an approved safety tag.
For the VF 6-9 the worklight will be placed in the
location denoted as [1].
2
Start routing the cable to the top of the machine
[2], use the wire channels given in the kit to neatly
tuck away the cable as it is being routed.
3
Once above the machine connect the extension
so that the work light cable will now reach the
connection area denoted as [4].
Disconnect the inner LED cable and add the
splitter to the connection area [4]. Connect the
work light cable and reconnect the inner LED light
cable.
Conceal the excess cable under the cable cover
sheet metal [3] as best you can.
Use zip ties wherever necessary to keep cable in
place.
4
Actuate the light switch on the side of the
controller to test that the work light turns on.
Table Work Light - Installation - AD0475
Page 3 of 6 pages