1
Installing the AP
Installation flowchart
Figure 3 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Power on the AP and connect the AP to the network. Examine the LEDs to verify that the AP is
operating correctly. For information about the LEDs, see "03-Appendix B LEDs and ports"
•
Record the MAC address and serial number of the AP for future use.
Determining the installation position
Determine the installation position by observing the following principles:
Start
Complete pre-
installation tasks
Determine the
installation position
Mount the AP
On a wall
On an 86 panel
Connect Ethernet fiber
ports
Connect the AP to the
network
Mount the AP
Connect the AP to the
power source
End
Содержание WA6120H
Страница 8: ...2 Figure 2 Installation tools...
Страница 21: ...i Contents Appendix A Technical specifications 1...
Страница 23: ...i Contents Appendix B Ports and LEDs 1 Ports 1 LEDs 3...