53
{
The router is installed.
The installation involves the following materials:
{
FMT
{
M5×10 self-tapping screws (two screws for one FMT)
2.
Installation procedure
To install the fiber management tray:
a.
Align the FMT and the installation holes on the column of the rack.
b.
Use a Phillips screwdriver to fix each FMT with two M5×10 self-tapping screws.
Figure 52
Installing FMTs
Cable routing recommendations
Interface cables and power cords should be separately routed. Reasonable cable routing can improve
efficiency by facilitating installation and removal of fan trays, PEM and some other components.
Follow these recommendations when you route cables:
•
Interface cables are routed through the cable management brackets on the left and right sides of the
chassis and bound at cabling racks on chassis sides, depending on the available equipment room
condition.
•
Put all the data signal cable adapters neatly under the chassis (instead of any places outside the
chassis in case of unexpected damages).
•
The power cords run along the left-rear of the chassis and out of the chassis either from the chassis
top or the raised floor depending on the equipment room conditions (power distribution rack,
lightning protection box, and connector strip, etc.) of the exchange office.
•
Long cables can be bound with cable ties. Do not bind cables at the air exhaust vent to prevent the
cables from aging too fast. For more information, see "
•
Fix cables as near the router as possible. The cables between the fixing point and router interfaces
must be bound loosely.
•
To identify cables, you can stick labels on them. For more information, see "
for cables."
Содержание SR8800 Series
Страница 12: ...3 Figure 2 SR8802 rear view 1 Rear cover handle 2 Grounding screw 3 Fan tray 3 2...
Страница 14: ...5 Figure 4 SR8805 rear view 1 Rear cover handle 2 Grounding screw 3 Fan tray 1 2 3...
Страница 16: ...7 Figure 6 SR8808 rear view 1 Air filter 2 Grounding screw 3 Rear cover handles...