
7
Installation accessories
Console cable
Grounding cable
Rear mounting
bracket and
load-bearing screw
Front mounting
bracket and M4
screws
Rubber pads
M6 screws
Cage nuts
ESD-preventive
wrist strap
Cable tie
Checklist before installation
Table 6
Checklist before installation
Item Requirements
Result
Ventilation
•
There is a minimum clearance of 10 cm (3.9 in) around the
inlet and exhaust vents for heat dissipation of the router
chassis.
•
A ventilation system is available at the installation site.
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
10% to 95% (noncondensing)
Cleanness Dust
concentration
≤
3 × 10
4
particles/m
3
ESD prevention
•
The equipment and floor are well grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are at a proper level,
respectively.
•
Wear an ESD-preventive wrist strap and uniform when
touching a circuit board.
•
Place the removed memory module, CF card, or
HIM/MIM on an antistatic workbench, with the face
upward, or put it into an antistatic bag.
•
Touch only the edges, instead of electronic components
when observing or moving a removed memory module,
CF card, or HIM/MIM.
Installation
site
EMI prevention
•
Take effective measures to protect the power system from
the power grid system.
•
Separate the protection ground of the router from the
grounding device or lightning protection grounding
device as far as possible.
•
Keep the router far away from radio stations, radar and
high-frequency devices working in high current.
•
Use electromagnetic shielding when necessary.
Содержание SR6602
Страница 81: ...73 Figure 59 V 35 DTE cable Figure 60 V 35 DCE cable Figure 61 X 21 DTE cable Figure 62 X 21 DCE cable...
Страница 82: ...74 Figure 63 RS449 DTE cable Figure 64 RS449 DCE cable Figure 65 RS530 DTE cable Figure 66 RS530 DCE cable...
Страница 88: ...80 I type 0404A01A 3 m i e 9 8 ft Australia Connector outline Power cable outline Connector outline...