background image

 

10 

Figure 9

 

Installing a card 

 

(1) Insert the card into the slot 

(2) Rotate the ejector levers inward 

(3) Fasten the captive screws 

 

 

Installing power modules 

 

CAUTION: 

Do not install an AC power module and a DC power module on the same IPS. 

 

The installation procedure is the same for AC and DC power modules. This section uses an AC power 

module as an example. For more information about AC and DC power modules available for the IPS, see 

H3C SecPath T9000 Intrusion Prevention System Series Installation Guide

To install a power module: 

1.

 

If the target power module slot has a filler panel installed, use a Phillips screwdriver to loosen the 
captive screws on the filler panel and remove the filler panel. 

2.

 

Unpack the power module. 

3.

 

Follow the installation graph printed on the filler panel of the power module to install the power 
module: 

a.

 

Correctly orient the power module. 

b.

 

Holding the power module handle with one hand and supporting the module bottom with the 
other, push the power module along the guide rails into the slot until it has firm contact with the 

slot. 
For vertical power module slots, see 

Figure 10

. For horizontal power module slots, see 

Figure 

11

4.

 

Press the handle on the power module into the handle slots in the power module. 

5.

 

Use a Phillips screwdriver to fasten the captive screw on the handle to secure the power module in 

the chassis. 

Содержание SecPath T9000 IPS Series

Страница 1: ...H3C SecPath T9000 Intrusion Prevention System Series Installation Quick Start New H3C Technologies Co Ltd http www h3c com hk Document version 5PW101 20170411...

Страница 2: ...her trademarks that may be mentioned in this manual are the property of their respective owners Notice The information in this document is subject to change without notice Every effort has been made i...

Страница 3: ...ackets to the IPS 4 Attaching the mounting brackets to the IPS 6 Installing the IPS in the rack 7 Grounding the IPS 8 Installing FRUs 8 Attaching an ESD wrist strap 8 Installing cards 9 Installing pow...

Страница 4: ...eserved for cable routing If you are to install multiple devices in the rack place the heaviest device at the rack bottom Installing the IPS IMPORTANT The IPS is heavy H3C recommends that you install...

Страница 5: ...bracket with the top flange of the slide rail or the top surface of the rack shelf 2 Mark the cage nut installation position on the front rack post Each installation hole in the mounting bracket corr...

Страница 6: ...cord management bracket for them For the T9010 IPS the signal cable management bracket installation position is at the upper part of the chassis The power cord management bracket installation position...

Страница 7: ...management brackets to a T9010 IPS 1 Attach the cable management bracket to the chassis 2 Screw holes for installing the cable management bracket 3 Screws for attaching the cable management bracket to...

Страница 8: ...ed at the lower part of the chassis Attaching the mounting brackets to the IPS Identify the left and right mounting brackets by their marks L and R Attach the left and right mounting brackets to the t...

Страница 9: ...de the IPS along the slide rails into the rack until the mounting brackets on the IPS touch the front rack posts The handle of the T9006 IPS is located at the top of chassis The handles of the T9010 a...

Страница 10: ...ounding screws to attach the two hole grounding lug to the grounding point on the chassis 4 Use the grounding screw to attach the ring terminal of the grounding cable to the grounding terminal on the...

Страница 11: ...s are either horizontally oriented or vertically oriented When installing a card in a horizontal slot make sure its PCB faces up When installing a card in a vertical slot make sure its PCB faces left...

Страница 12: ...anel installed use a Phillips screwdriver to loosen the captive screws on the filler panel and remove the filler panel 2 Unpack the power module 3 Follow the installation graph printed on the filler p...

Страница 13: ...ord WARNING Before you connect a power cord make sure the circuit breaker at the power input end is switched off To connect an AC power cord 1 Plug the AC power cord connector into the power receptacl...

Страница 14: ...cle of the power module 2 Fasten the screw on the connector to secure the power cord in place Figure 13 Connecting a DC power cord T9010 1 Plug the DC power cord connector into the power receptacle of...

Страница 15: ...er module gently push the module into the slot until you feel that the bottom spring tab catch in the slot For a QSFP module that uses a plastic pull latch skip this step Figure 14 Installing an XFP S...

Страница 16: ...ting switch first connect the PC end To disconnect a PC from an operating switch first disconnect the switch end Obtaining documentation To access the most up to date H3C product documentation on the...

Страница 17: ...G Grounding the IPS 8 I Installing FRUs 8 Installing the IPS 2 L Logging in to the IPS 13 O Obtaining documentation 14 P Preparing for installation 2 Copyright 2017 New H3C Technologies Co Ltd For mor...

Отзывы: