2
Installation flowchart
Figure 1 Installation flowchart
Rack-mounting the gateway
CAUTION:
The gateway is heavy. For rack stability, install it at a lowest possible position.
HVDC power
supplies
Install cable
management brackets
Yes
Ground the gateway
Check before and
after power-on
Operating
correctly?
End
Power off the
gateway
Troubleshoot the
gateway
Install modules
Rack-mount the
gateway
Connect signal
cables
Install fan trays
Install power
supplies
DC power supplies
AC power supplies
Interface modules, AI
security engine modules,
and interface switch
modules
Supervisor engine
modules and switching
fabric modules
Start
Prepare for
installation
No