7
Installation tools and accessories
No installation tools are provided with the gateway. Prepare them yourself as required.
Figure 3 Installation tools
Figure 4 Installation accessories
Pre-installation checklist
Table 6 Pre-installation checklist
Item
Requirements
Result
Installation site
Load bearing
•
The floor or ground at the installation site can
support the sum of the weight of the gateway
and the rack.
•
The slide rails can support the weight of the
gateway.
Space
•
There is a minimum clear height of 3 m (9.84
ft) (from the beam or the air duct to the floor) in