
Installation Manual
H3C S9500 Series Routing Switches
Chapter 2 Preparing for Installation
2-16
2.5 Installation Tools
Table 2-10
Required installation tools
Measure
and
lineation
tools
Long tape, ruler (1 meter in length), gradienter, marking
pen, powder marker, pencil
Drills
One percussion drill, several drill bits, one vacuum
cleaner
Fastening
tools
Plain screwdriver P4 - 75 mm
Cross-head screwdriver P1 – 100 mm, P2 – 150 mm
and P3 – 250 mm
Box wrench M5
Ring spanner M6
Double ring spanner (10-12) or open ended spanner
(10-12)
Small tools
Sharp-nose pliers, diagonal pliers, vices, hand-held
electric drill, file, handsaw, crowbar, rubber hammer
General
tools
Auxiliary
tools
Brush, tweezers, paper knife, hand bellows, electric
iron, solder wire, fork, ladder
Special tools
ESD-preventive wrist strap, cable stripper, crimping
pliers, RJ-45 crimping pliers, wire punch-down tool
Meters
Multimeter, 500 V Meg-ohmmeter (used for measuring
the insulation resistance), error detector, optical power
meter, earth resistance tester
Note:
The instruments and tools are not shipped with the S9500 series. Therefore, you need
to prepare the required instruments and tools.