Installation Manual
H3C S3100 Series Ethernet Switches
Chapter 4 First Power-on
4-4
Figure 4-6
Set terminal emulation in H3C Properties window
4.4 Booting Switch
4.4.1 Checking Before Powering on the Switch
Before powering on the switch, verify that:
z
The power cable and grounding cable are properly connected.
z
The supply voltage is consistent with that required by the switch.
z
The console cable is properly connected; the terminal (which can be a PC) used
for configuration has been started; and the configuration parameters have been
set.
4.4.2 Powering on the Switch
All the S3100 series Ethernet switches have the same Boot ROM display style. This
document takes the Boot ROM display of the S3100-16C-SI switch as example:
Starting......
***********************************************************
* *
* H3C S3100-16C-SI BOOTROM, Version 506 *
* *
***********************************************************