Installation Manual
H3C SecPath F1800-A Firewall
Chapter 3 Installation
3-12
3.8 Installation Verification
During installing the equipment, you must check the installation each time you power
on the SecPath, making sure that:
z
There is enough space around the cabinet for heat dissipation;
z
The cabinet is stable enough;
z
The correct power supply is used;
z
The PGND wire of the SecPath is connected properly;
z
The connections with other devices, such as the console terminal, are correct.
Note:
This step is critical, since the factors, such as whether the chassis, grounding, power
supply are properly located, all affect the normal working status of the SecPath.