ERGO LIFT 650
4
PACKAGING AND UNLOADING
The ERGO LIFT user and maintenance manual is included in the packaging of the hydraulic unit. On
delivery, check for external transport damage. In case of visible damage, leave the goods and packaging
as they are. Do not use the goods and contact your dealer directly. Failing this, a reservation must be made
to the carrier. Under no circumstances can GYS be held responsible.
Unloading can be done with a forklift or hand pallet truck as soon as the pallet is placed on the floor. Wear
gloves and safety shoes. Take into account the centre of gravity noted on the packaging when picking up
and moving the pallet.
1- Determine an area with sufficient space and good lighting.
2- Unpack and place the hydraulic power unit on the ground, aligning the beam so that it is not folded on itself
and/or twisted.
Retrieve the accessories (rubber pads, drawbar accessories, wheels and pins).
3- Remove the cardboard cover on the lift and carry out a visual inspection to check that nothing is damaged
and that there are no visible oil leaks at the connections.
***There may be "traces of oil" prior to first use that are related to the manufacturing process. Wipe
with a clean, dry cloth if necessary ***
4- Connect the hydraulic group to the mains and press the "ON" button on the side of the hydraulic group.
The button lights up to indicate that the hydraulic power unit is energised.
5- Press the up button or "
↑
" on the remote control until the lift reaches the very top (no need to top up the
oil, the unit is ready for use). A double beep will indicate that the maximum position has been reached. The
Packing with lift