
PEL-2000 Series User Manual
106
Channel Control
The Channel Control connectors on the rear panel can be used to
control and monitor the status of up to 8 channels. For more
information on channel control, see page 85.
Step
Description
Details
1.
Setup
Ensure the load and PEL series
mainframe is turned off.
2.
Choose the appropriate load
module(s).
Page 35
3.
Connection
Connect the terminals to the DUT. Page 43
4.
Connect the channel control
connectors on the rear panel.
Page 56 & 235
5.
Turn on the PEL series mainframe
and DUT (load).
6.
Configure
Select the Mode* and Range* via
the front panel.
CC Pages 122,
123
CV Page 134
7.
Activate channel control for each
channel that will be used for
external control, i.e., set CH CONT
to External.
Page 170
8.
Run
Run the load. Turn the load on by
either outputting an active low
signal to the appropriate channel
control connector or use the
mainframe LOAD key*.
Page 56 & 85