![Guyson Euroblast PF Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/guyson/euroblast-pf/euroblast-pf_operating-and-maintenance-instructions_2279332077.webp)
Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 77
10.2.1 Electrical installation of dust collectors and cyclones
Guyson dust collectors and motorised cyclones (whether for single or three phase supplies), when
supplied to complement blast cabinets, are fitted with starters. These should be wired from the
customer’s switched fused isolator.
The starter needs to be wired up by a suitably qualified electrician; electrical schematics for the single
and three phase systems are attached.
The supply required can be discovered from reading this chart:
Model
Phase
Voltage
Cycle
(Hz)
Power
(kW)
Full load
current (A)*
21/41
1
230
50
0.37
3
C400
1
230
50
0.75
5
C800
1
230
50
1.5
6.8
75/16
1
230
50
0.55
4.7
CY600
1
230
50
1.5
6.8
41
3
400
50
0.37
1.4
C400
3
400
50
0.75
1.8
C800
3
400
50
1.5
3.6
75/16
3
400
50
0.55
1.5
CY600
3
400
50
1.5
3.6
CY900
3
400
50
1.5
3.6
* Fuses should be sized to comply with full load current. When sizing fuses, smallest fuse rating
should be used to suit motor and starting characteristics.
Single phase supply
Three phase supply
Содержание Euroblast PF
Страница 66: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 66 10 Appendices...
Страница 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Страница 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Страница 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...
Страница 83: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 83 Wiring diagram...
Страница 84: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 84 General arrangement...