![guth RA 45 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/guth/ra-45/ra-45_operating-manual_2279200018.webp)
7. Cleaning
The following shutdown procedure must be followed before any cleaning, maintenance or
repair work is carried out:
Switch off the mixer
- Switch off the on/off switch.
- Pull out the mains plug.
Shut off the product supply
- Close the tank fitting.
Dismount the mixer
There is a danger to life and limb of the
personnel if this procedure is not followed!
7.1 Daily cleaning
Clean only with water during the individual work intervals. Do not use a cleaning agent, because thorough rinsing
is then necessary
© Copyright
Page
| 03
Distribution and reproduction of this document, commercialisation and publication of its content is strictly forbidden. Contravention
is liable to payment of damages. All rights reserved.
Flow Components
Capital Equipment
Engineered Processing Units