16
©
Guldmann
G
B
/U
S
-1
19
7/
03
/0
7
•
#
94
41
26
©
Guldmann
G
B
/U
S
-1
19
7/
03
/0
7
•
#
94
41
26
©
Guldmann
G
B
/U
S
-1
19
7/
03
/0
7
•
#
94
41
26
5.02
Inspection – all-round
Important!
The accompanying safety chain/strap
MUST be used when a service
engineer is working under the
lifting platform.
During the service inspection, a
report must be kept of what has
been inspected and replaced.
Parts that are worn out or defective
must be replaced with new spare
parts from Guldmann
TM
.
1. Visually checking the product
• Check the product for signs of wear and tear.
• Check the product for any faults.
• Check that there is no other form of damage to the product.
2. Testing of the product as for normal use
• Check all the product’s functions, loaded and unloaded.
• Check that the emergency lowering works.
3. Checking the electrical state of the product
• Check electrical functions and signals.
• Check the wiring for faults and defects.
• Check the cable bushings.
• Check connection options, connectors, etc.
• Check the seal on the control box.
4. Checking the mechanical state of the product
• Clean dirt and other impurities from the product.
• Inspect and assess vital parts of the product.
• Replace any parts of the product that are defective or worn out.
• Check and tighten vital parts.
• Lubricate the product.
5. Go through point 2 again, to check that everything works.
6. Did any new problems arise/were new problems noted in point 5?
• If new problems arose, go back to point 2.
• If no new problems were noted, finish the inspection.
Содержание Stepless LP5
Страница 2: ...GB US LP5 LP5 Lifting platform ...
Страница 23: ...22 Guldmann GB US 1197 03 07 944126 ...
Страница 24: ... Guldmann GB US 1197 03 07 944126 23 Guldmann GB US 1197 03 07 944126 ...