12
© Guldmann GB/US-12/2018 • # 557164_4
© Guldmann GB/US-12/2018 • # 557164_4
Note:
There must be a load on the lifting strap corresponding to the weight of
Guldmann’s lifting hanger before GHZ’s lowering function will operate.
Charging / connection
GHZ is recharged when the hand control is placed in the charging station.
Always leave the hand control in the charging station when GHZ is not in use.
This guarantees GHZ functionality and maintains the battery to ensure a long
lifetime.
The power supply must be connected and switched on before charging can
take place. A green indicator lamp on the power supply indicates it is con-
nected and switched on.
Tilt the hand control and place it on the two pins on the charging station.Then
push the rubber handle into the opening of the charging station. A click indi-
cates that the hand control is placed correctly.
When the hand control is correctly placed in the charging station, you will receive
an acoustic signal of 3 beeps. This means that the hoist is now charging.
The indicator lamp on the bottom of the hoist turns yellow if the charge status
becomes low. The GHZ then has a limited number of lifts available at a time
and must be recharged.
Placing of the hand control
When GHZ is not in use the hand control must always be placed in the char-
ging station. The hand control can also be placed on the lifting hanger if this
is necessary in connection with a transfer.