G
uar
di
an
F
al
l P
ro
te
ct
io
n
63
05
S
. 2
31
st
St
.,
Ken
t,
W
A
9
80
32
5
Anchor (live) end
Terminated (dead) end
Installation and Use
Prior to use, plan your system:
1. Ensure all PFAS equipment is selected and deemed compatible by a Competent Person.
2. Eliminate or minimize all risk of swing fall.
3. Determine desired location for HLL; ensure location is free of debris, rot, cracking, and hazardous materials.
4. Installation, set-up, and use of HLL system must be done under the supervision of a Qualified Person.
Installation:
1. Ensure rope is properly threaded in tensioner by adhering to steps # 2 - 4.
2. Unscrew knob on tensioner housing and open housing plate to reveal rope threading diagram as shown.
3. Thread rope such that the anchor (live) end and terminated (dead) end exit tensioner as indicated. Rope
must sit in the groove of the drum. Close tensioner plate and tighten knob until snug.
Содержание Big Boss HLL
Страница 2: ......