- 12 -
STC 4-16 IPS CI
3.3
P
otential
equalisation
(Pe)
Equalise the potential (PE) in accordance with IEC/EN/DIN EN 60728.
• Connect the PE connection terminal
1
to a PE rail (supplied by customer)
using the PE wire (Cu 4 mm
2
- 9 mm
2
).
3.4 C
onneCting
the
deviCe
• Connect the SAT IF inputs…
3
vertical low*;
4
vertical high*
5
horizontal low*;
6
horizontal high*
… to the corresponding outputs of an LNB.
*Factory defaults for the preprogrammed ASTRA reception, can be changed individually.
•
Make sure that all inputs have the same level!
—> For multiple satellite reception observe the dCSS/Unicable II mode
• Connect the attached mains cable to the IEC connector C14
9
.
• Connect the mains cable to a mains socket with protective conductor con-
nection. Thereby note the voltage specified on the device.
—> This device has no power switch and starts immediately after con-
necting the operating voltage.
For a complete disconnection from the mains, the mains plug must
be pulled out of the mains socket. Ensure that the mains plug can be
pulled out without difficulties.
• Configure the device (page 14).
• Make sure the LAN network is adapted and configured for streaming!
Therefore note menu
Help > Multicast Setup
or
www.mygss.eu > Service >
Service Informations > IPTV network setup
.
•
If the configuration is finished
connect the streaming output
11
to the stream-
ing network.