![GSi PNEG-1057 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/gsi/pneg-1057/pneg-1057_assembly-and-operation-manual_2275151021.webp)
5. 10" Vertical Assembly Instructions
PNEG-1057
8" and 10" Commercial Vertical Bin Unload Auger
21
Tube Assembly (Continued)
Figure 5A 10" Vertical Tube Assembly
Ref #
Description
Ref #
Description
A
Belt (57")
H
Flange Bearing
B
Key
I
Top Mounting Angle
C
Head Plate Assembly
J
Head Drive Stub Shaft
D
Half Band Clamps
K
Mount Pulley
E
Motor Mount Rods
L
Belt Guard
F
Motor Mount Top
M
Discharge Spout
G
Motor Mount Bottom
Lock out all power sources while installing or maintaining equipment.
Keep all safety devices and shields in place at all times until power source is
locked out.