![GSI Group PNEG-1276 Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/gsi-group/pneg-1276/pneg-1276_construction-and-owners-manual_2275172063.webp)
9. Assembly
PNEG-1276
Top Dry Autoflow Construction Manual 24', 30' and 36'
63
Small Platform Assembly
For 36" Fans and Smaller or with #1 fan when two (2) 36" or smaller fans
are installed
Before assembling any platform, read all of the instructions first to assure proper placement and assembly.
for proper location of small platform. Begin by assembling the small platform support
frame using 3/8" x 1" bolts on all connections. Use 5/16" x 1-1/4" bin bolt to attach platform vertical
supports to sidewall stiffeners.
Be sure and locate the 5/16" x 1-1/4" bolts from the inside of the bin to the outside. This will provide
maximum weather protection.
Figure 9O
Ref #
Part #
Description
Weight
Qty
1
TD-100051
Channel Bracket
3.90
8
2
TD-100052
Handrail Post 49-3/4"
31.69
4
3
TD-100059
Long Toeboard 78-1/2"
10.96
2
4
TD-100060
Short Toeboard 54-1/2"
3.80
1
5
TD-100061
Long Handrail 78-1/2"
37.52
4
6
TD-100062
Short Handrail 54-1/2"
13.02
2
7
TD-100064
Floor Plank 78"
112.87
11
8
TD-100066
“X” Brace Strap 60"
7.26
4
9
TD-100067
Mid Channel Support 74"
32.73
2
10
TD-100070
Side Channel Support 78-1/2"
41.26
2
11
TD-100072
End Channel Support 78-1/2"
41.60
2
12
TD-100686
Vertical Support 70"
43.11
2
13
TD-100083
Support Channel 80-7/8"
32.98
2
14
TD-100084
Knee Brace 83-5/8"
23.67
2
N/S
TD-100090
Small Platform Hardware Package
8.96
1