8. Installation
PNEG-1276
Top Dry Autoflow Construction Manual 24', 30' and 36'
51
36' Leveling Band Locations (Continued)
Number 3 Set of Leveling Bands
Figure 8W
Number 4 Set of Leveling Bands
Figure 8X
36' Leveling Band Grain Depth Settings
36'
Old
New
36'
Old
New
Inner
31.5"
Same
No. 4
14.2"
12.2"
No. 2
26.5"
22.5"
Dump Time Estimate
(Corn at 105°)
36 Sec.
31 Sec.
No. 3
20.2"
16.2"
Grain Temperature Sensor
Distance from Floor
10-1/2"
8-1/2"