9. Assembly
PNEG-1276
Top Dry Autoflow Construction Manual 24', 30' and 36'
57
Perforated Center Band
Drill 3/8" diameter holes equally spaced as shown in
for top band clips. Attach clips using
5/16" x 3/4" bin bolts. Add perforated band sections. Note that these do not attach to the leveling bands
but hang down on the inside of the top inner leveling band.
Figure 9H
Nominal Diameter
of Tank (Ft.)
# of Holes
Dimension
24'
6
25-1/4"
30'
6
22"
36'
12
30"
Nominal Diameter
of Tank (Ft.)
Part # “A”
Qty
24'
TD-100219
3
30'
TD-100545
6
36'
TD-100726
6