
Chapter 2: Installing the Front Platform
35.Install the inner toeboard (55) to the floor planks (41 and 46) and floor supports using #14 x 3/4 in.
truss head screws (7).
36.Install the inner toeboard (56) to the floor planks (43 and 52) and floor supports using #14 x 3/4 in.
truss head screws (7).
37.Install the supports (57 and 58) to the floor planks (40 and 48) and floor supports using #14 x 3/4 in.
truss head screws (7).
38.Install the supports (59 and 60) to the floor planks (42 and 49) and floor supports using #14 x 3/4 in.
truss head screws (7).
39.Install the inner toeboard (61) to the floor planks (51 and 54) and floor supports using #14 x 3/4 in.
truss head screws (7).
40.Secure the inner toeboards (55 and 56) and supports (57, 58, 59 and 60) to the floor planks using 5/
16 x 3/4 in. screws (4) and 5/16 in. flange nuts (10).
41.Secure the floor planks to the handrail posts using 5/16 x 3/4 in. screws (4) and 5/16 in. flange
nuts (10).
Figure 2-17
Installing the toeboards and supports (D04-1295)
4
5/16 x 3/4 in. screws (S-6620)
57
Support (D01-3601)
7
#14 x 3/4 in. truss head screw (725-1003-5)
58
Support (D01-3602)
10
5/16 in. flange nut (S-10268)
59
Support (D01-3603)
55
Inner toeboard (D01-3580)
60
Support (D01-3604)
56
Inner toeboard (D01-3581)
61
Inner toeboard bracket (D01-3639)
28
PNEG-2237
Stack Quiet Dryer Front Platform Assembly