
Chapter 2: Installing the Front Platform
14.Install the hitch tube splice plate (24), the hitch support brackets (25) and the middle handrail sup-
port (26) to the hitch tube weldment (13) using 5/16 x 1 in. flange bolts (5) and 5/16 in. flange nuts
(10). Also, install six 5/16 x 3/4 in. flange bolts (3) and 5/16 in. flange nuts (10) to connect the hitch
tube splice plate (24) and the hitch support bracket (25).
15.Install the hitch support brackets (25) to the corner brace brackets (19) using 5/16 x 3/4 in. flange
bolts (3) and 5/16 in. flange nuts (10).
16.On the hatch side, install the middle handrail bracket (27) and floor support bracket (28) to the side
support bracket (20) using 5/16 x 3/4 in. flange bolts (3) and 5/16 in. flange nuts (10).
17.On the hatch side, install the floor support bracket (28) to the side splice plate (21) and side support
bracket (20) using 5/16 x 3/4 in. flange bolts (3) and 5/16 in. flange nuts (10).
Figure 2-7
Installing the hitch tube weldment supports and floor supports (D04-1295)
3
5/16 x 3/4 in. flange bolt (S-6606)
21
Side splice plate (D01-3571)
5
5/16 x 1 in. flange bolt (S-7470)
24
Hitch tube splice plate (D01-2765)
10
5/16 in. flange nut (S-10268)
25
Hitch support bracket (D01-2766)
13
Hitch tube weldment (D04-0904-BK)
26
Middle handrail support (D01-2786)
19
Corner brace bracket (D01-3069)
27
Middle handrail bracket (D01-3067)
20
Side support bracket (D01-3068)
28
Floor support bracket (D01-3582)
18
PNEG-2237
Stack Quiet Dryer Front Platform Assembly