background image

Shipment Inspection

Examine the components carefully to make sure no 

damage has occurred to the pump during shipment.  Care 

should be taken to ensure the pump is 

NOT dropped or 

mishandled; dropping will damage the pump.

Pre-Installation Checklist

Before beginning installation procedures, the following checks 

should be made.  They are all important for proper installation 

of the circulator pump.

1. Uses:   

Model UP(S)15, 26, 43 and 50 series pumps 

are generally designed to circulate water from 32 deg F to 

230 deg F up to a maximum pressure of 150 psi. 

Some 

models have temperature limitations which are shown 

in Table 2A below.

 If required, a 50% by volume solution 

of ethylene or propylene glycol and water can be used, 

however, a decrease in pump performance may result 

due to an increase in the viscosity of the solution.  Check 

with manufacturer for information regarding suitability of 

pumping other fluids.

Closed Systems:  Model UP(S)15, 26, 43 and 50 series 

pumps with cast iron pump housings are designed to pump 

water compatible with their cast iron construction. They 

are recommended for use in closed hydronic systems. 

(i.e. airless, non-potable water).
Open Systems:  Model UP(S)15, 26, 43 and 50 series 

pumps with stainless steel or bronze pump housings are 

designed to pump water compatible with their construction 

and can be used in both open and closed systems. 

2. Maximum Water Temperature:

  

The maximum 

allowable water temperature is determined by the ambient 

or surrounding air temperature as shown in Table 2A.

Table 2A – Maximum Water Temperature

Ambient (°F) 

104 

120 

140 

160 

175 

Water All UP* (°F) 

230 

220 

210 

190 

175

UPS15-35 

165 

140 

 - 

-   

UP15-100F (°F) 

205  195 185  175  -

UP26-120U (°F) 

205  195 185  175  -

UP26-116 (°F) 

150 

140 

 -

*Exceptions below:

 

Installation

2

Содержание UPS 15

Страница 1: ...n and operating instructions Shipment Inspection 2 Pre Installation Checklist 2 Installation 3 Electrical 4 Start Up 5 Operation 6 Failure to Operate 6 Warranty 7 CONTENTS GRUNDFOS INSTRUCTIONS UP Series circulators ...

Страница 2: ...due to an increase in the viscosity of the solution Check with manufacturer for information regarding suitability of pumping other fluids Closed Systems Model UP S 15 26 43 and 50 series pumps with cast iron pump housings are designed to pump water compatible with their cast iron construction They are recommended for use in closed hydronic systems i e airless non potable water Open Systems Model U...

Страница 3: ... box position needs to be changed it is best to do so before installation However if the pump is already installed ensure that the electrical supply is turned off and close the isolation valves before removing the Allen screws To change terminal box position 1 Remove the four 4 Allen screws 4 or 5mm wrench while supporting the stator motor 2 Carefully separate the stator from the pump chamber and ...

Страница 4: ...he lowest point of the system where dirt and sediment naturally collect 3 Install an air vent at the high point s of the system to remove accumulated air 4 Ensure that water does not enter the terminal box during the installation process 5 Open System Install the pump in the supply line the suction side of the pump should be flooded with water Ensure that the static head requirement from Table 2B ...

Страница 5: ...plate attached to the top of the motor Depending on pump model the motor has either built in automatic resetting thermal protection or is impedance protected and in either case does not require additional external protection The temperature of the windings will never exceed allowable limits even if the rotor is locked Wire sizes should be based on the ampacity current carrying properties of a cond...

Страница 6: ...e electrical supply and close the isolation valves on each side of the pump Remove the indicator plug in the middle of the nameplate Insert a small flat blade screwdriver into the end of the shaft and gently turn until the shaft moves freely Replace and tighten the plug Open the isolation valves and wait 2 to 3 minutes for the system pressure to equalize before starting the pump NOTE After a long ...

Страница 7: ...s and not by GRUNDFOS warranty GRUNDFOS will not be liable for damage or wear to products caused by abnormal operating conditions accident abuse misuse unauthorized alteration or repair or if the product was not installed in accordance with GRUNDFOS printed installation and operation instructions To obtain service under this warranty the defective product must be returned to the distributor or dea...

Страница 8: ... Grundfos Canada Inc 2941 Brighton Rd Oakville Ontario L6H 6C9 Telephone 905 829 9533 Fax 905 829 9512 Bombas Grundfos de Mexico S A de C V Boulevard TLC 15 Parque Industrial Stiva Aeropuerto C P 66600 Apodaca N L Mexico Telephone 52 81 8144 4000 Fax 52 81 8144 4010 L UP TL 053 06 11 Repl 06 07 PRINTED IN USA ...

Отзывы: