6. Electrical connection

The electrical connection must be carried out by an 
authorized electrician in accordance with local regu-
lations.

The mains voltage and frequency stated on the 
pump nameplate should be compared with the actual 
electricity supply available.

6.1 Motor protection

Single-phase pumps:

The pump incorporates a thermal overload switch 
and requires no additional motor protection.

Connect the pump supply cable as shown in fig. 5.

Fig. 5 

Three-phase pumps:

The pump must be connected to a motor starter. 
The set rated current of the motor starter must corre-
spond to the electrical data stated on the pump 
nameplate.

6.2 Checking direction of rotation

Applies to three-phase pumps only:

The direction of rotation should be checked every 
time the pump is connected to a new installation. 

Proceed as follows:

1. Position the pump on a plane surface. 

2. Start the pump and stop it immediately.

3. Observe the movement (jerk) of the pump when 

started (seen from the top of the pump). 
The direction of rotation is correct (clockwise) if 
the pump sleeve moves counter-clockwise, see 
fig. 6.

Fig. 6 

If it is not possible to check the direction of rotation 
as described above because the pump has already 
been installed, proceed as follows:

TM

02

 66

07

 22

05

Pos.

Description

1

Pipework support

2

Non-return valve

3

Drain  plug

4

Pipework support

5

Non-return valve

6

Suction strainer

Before starting work on the pump/motor, 
make sure that the electricity supply has 
been switched off and that it cannot be ac-
cidentally switched on. 

The pump must be connected to an exter-
nal mains switch with a minimum contact 
gap of 3 mm in all poles.

The pump must be earthed. 

1

2

3

4

5

6

SPO pump with base plate 

in dry installation 

M

in. 2 

m

When the motor has cooled to normal tem-
perature, it will restart automatically. 

T

M

02

 67

59

 16

03

L1

Black

L2

Blue

L3

Brown

Yellow/green

TM

02

 66

08

 1

103

L

N

1

L1

L2

L3

3

Содержание SPO 3-40A

Страница 1: ...SPO GRUNDFOS INSTRUCTIONS Installation and operating instructions...

Страница 2: ...e com as Directivas do Conselho das Comunidades Europeias relativas aproxima o das legisla es dos Estados Membros respei tantes M quinas 98 37 CE Norma utilizada EN ISO 12100 Compatibilidade electroma...

Страница 3: ...nte electrice destinate utiliz rii ntre limite exacte de tensiune 73 23 CEE 95 Standarde aplicate EN 60335 1 1994 i EN 60335 2 41 1996 Grundfos SPO 98 37 EO EN ISO 12100 89 336 E O EN 61000 6 2 EN 610...

Страница 4: ...ndarts EN ISO 12100 Elektromagn tisk savienojam ba 89 336 EEK Piem rotie standarti EN 61000 6 2 un EN 61000 6 3 Elektriskais apr kojums kas paredz ts lieto anai zin mu sprieguma robe v rt bu ietvaros...

Страница 5: ...tsinstruktion 60 Asennus ja k ytt ohjeet 66 Monterings og driftsinstruktion 72 Instrukcja monta u i eksploatacji 78 84 Szerel si s zemeltet si utas t s 92 Navodilo za monta o in obratovanje 98 Monta n...

Страница 6: ...lower or lift the pump by means of the supply cable 3 2 Storage The pump must be stored indoors in a dry position Note Pumps with base plate must be drained before storage 4 Technical data See pump n...

Страница 7: ...t contain sand or solid sediment Installation in well Install the pump so that the pump inlet is at least 1 metre above the bottom of the well Installation in tank Place the pump on the bottom of the...

Страница 8: ...mp on a plane surface 2 Start the pump and stop it immediately 3 Observe the movement jerk of the pump when started seen from the top of the pump The direction of rotation is correct clockwise if the...

Страница 9: ...ids other than clean water it should be flushed through with clean water immediately after use 8 1 Periods of inactivity If the pump is taken out of operation for a long pe riod it should be drained P...

Страница 10: ...Pull out the pump and clean or replace the valve d The suction strainer is choked up Pull out the pump and clean the suction strainer and the impeller if necessary see section 9 1 Cleaning the pump su...

Страница 11: ...itch to ensure suitable time between the cutting in and cutting out of the pump see section 7 1 Adjustment of float switch c The non return valve is leaking or stuck half open Clean or replace the non...

Страница 12: ...TM02 6643 4403 104 115 67 75 73a 50 84 66 5a 6 64 4 49 4 64 49 64c 105a 62 37 155 193 105 69a 69 20 182a 182 20a 16 160 14 13 156a 37b 173 158 154 37c 48 47 172 152 153 151 37d 155a 193a 161 157 176a...

Страница 13: ...644 4403 18 28 36a 67 75 73a 37a 56 66 5a 6 64 4 49 4 64 49 64c 105a 62 37 155 193 105 69a 69 20 20a 16 160 14 13 26 156a 37b 173 158 154 37c 48 47 172 152 153 151 37d 155a 193a 161 157 176a 181 18 10...

Страница 14: ...lefax 81 53 484 1014 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia...

Страница 15: ...www grundfos com 96506912 1005 185 Repl 96506912 0503 Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence...

Отзывы: