![Grundfos LC 108 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/grundfos/lc-108/lc-108_installation-and-operating-instructions-manual_2271098036.webp)
English (GB)
36
14. Fault finding chart
See also installation and operating instructions for the pump in
question.
15. Disposal
This product or parts of it must be disposed of in an
environmentally sound way:
1. Use the public or private waste collection service.
2. If this is not possible, contact the nearest Grundfos company
or service workshop.
Subject to alterations.
Warning
Before starting any work on pumps used to pump liquids which could be constituted as being hazardous to health, thorough
cleaning/venting of pumps, pits, etc. must be carried out according to local regulations.
Before making any connections in the LC 108 or work on pumps, pits, etc., it must be ensured that the electricity supply has
been switched off and that it cannot be accidentally switched on.
Fault Cause
Remedy
1. The pump does not
run.
a) No electricity supply.
Without battery back-up:
None of the indicator lights are on.
With battery back-up
(accessory for certain
variants):
See section
or
Switch on the electricity supply.
b) The ON-OFF-AUTO selector switch is in
position OFF
( ), see section
,
or
Push the ON-OFF-AUTO selector switch into position
ON ( ) or AUTO ( ).
c) Control circuit fuses are blown.
Check and eliminate the cause. Replace the control
circuit fuses (see pos. 6 in fig.
or fig.
d) The motor protection relay has cut out the
pump (the red indicator light for pump fault is
permanently on).
Check the pump/pit.
e) The PTC resistance/thermal switch has cut out
the pump (the red indicator light for pump fault
is flashing, see section).
Allow the pump to cool. After cooling, the pump will
restart automatically unless the LC 108 has been set to
manual restarting, see section
,
,
,
. If so, the ON-OFF-AUTO selector switch must be
pushed into position OFF
( ) for a short period.
If the pump cutout was caused by choked-up float
switches, electrodes or flow switch, these must be
cleaned or replaced.
f)
The control circuit for the motor protection relay
has been broken or fails (the green indicator
light indicating pump operation is permanently
on, see section
or
Check the control circuit.
g) Motor/supply cable is defective.
Check motor and cable.
h) The float switches, electrodes or the flow
switch are/is defective.
Check cables, float switches, electrodes or the flow
switch.
i)
The CU 211 module is defective.
Replace the CU 211 module.
j)
The new DIP switch setting does not work
correctly.
Switch off the electricity supply to the controller for
1 minute and switch it on again (normal procedure).
See section
or
.
2. The pump is starting/
stopping too
frequently.
a) The float switches, electrodes or the flow
switch are/is defective.
Check cables, float switches, electrodes or the flow
switch.
Содержание LC 108
Страница 1: ...LC 108 Installation and operating instructions GRUNDFOS INSTRUCTIONS LC 108...
Страница 52: ...52...