Grundfos Dosing monitor Скачать руководство пользователя страница 4

4

CONTENTS

Page

1.

Technical data

4

2.

General description

4

2.1

Definitions 5

2.2

Logic 5

2.3

Operation with vent valve

5

3.

Mounting and setting of dosing monitor

6

1. Technical data

Maximum pressure:

10 bar.

Maximum liquid temperature:

35°C.

Maximum liquid viscosity:

20 mPas.

Pulse transmitter 
(reed contact), maximum load: 48 VAC/VDC, 0.5 A.

Materials in contact with 
the pumped liquid:

PMMA/PVC/
PVDF/FKM.

2. General description

Fig. 1 

The dosing monitor is designed to monitor the dosing 
of liquids which may cause gas accumulation in the 
dosing head, thus stopping the dosing process even 
if the pump is still operating.

For every measured dosing stroke, the dosing moni-
tor gives a pulse signal to the level input so that the 
pump can compare performed dosing strokes (from 
internal stroke sensor) with externally measured 
physical strokes (from the dosing monitor). If an ex-
ternal dosing stroke is not measured together with 
the internal dosing stroke, this is considered a fault 
that may have been provoked by empty tank or gas 
in the dosing head. 

When used together with a 

DME pump

, the monitor 

will only operate if it is mounted on the suction side 
of the pump.

When used together with a 

DMS pump

, the monitor 

will operate if it is mounted on the suction or dis-
charge side of the pump.

The dosing monitor should be connected to the "low 
level" input (pins 2 and 3). This input must be config-
ured for dosing monitoring. Consequently, it cannot 
be used as a level input. 

Once the input has been set to dosing monitoring 
and a dosing monitor has been connected and set, 
the dosing monitoring function will be active.

Note:

 Make sure that the rubber gaskets supplied 

with the monitor are fitted as indicated by a * in fig. 1.

Before beginning installation procedures, 
these installation and operating instruc-
tions should be studied carefully. The in-
stallation and operation should also be in 
accordance with local regulations and ac-
cepted codes of good practice.

T

M

02

 20

29

 32

01

 / T

M

02

 20

30

 32

01

 / T

M

02

 2

0

3

1

 32

01

Dosing stroke 
measured

Dosing stroke 
measured

Dosing stroke 
measured

Monitor mounted on 
pump suction side 
(DME and DMS)

Monitor mounted on
pump discharge side
(DMS only)

Monitor mounted in dosing 
tube 
DMS: In dosing tube
DME and DMS: In suction tube

*

*

*

*

Содержание Dosing monitor

Страница 1: ...Dosing monitor GRUNDFOS INSTRUCTIONS Installation and operating instructions...

Страница 2: ...2...

Страница 3: ...i n y funcionamiento 16 19 Installatie en bedieningsinstructies 22 Monterings och driftsinstruktion 25 Asennus ja k ytt ohjeet 28 Monterings og driftsinstruktion 31 Instrukcja monta u i eksploatacji 3...

Страница 4: ...as in the dosing head When used together with a DME pump the monitor will only operate if it is mounted on the suction side of the pump When used together with a DMS pump the monitor will operate if i...

Страница 5: ...t will be on and the alarm output if any will be activated variant AR For each correct stroke the counter is reset and the alarm output if any is deactivated 2 3 Operation with vent valve Fig 2 It is...

Страница 6: ...ose the bypass valve and prime the floater channel 8 Open the bypass valve and check that the pump is in alarm mode the red indicator light is on 9 Close the bypass valve gradually and adjust the cont...

Страница 7: ...61...

Страница 8: ...62...

Страница 9: ...efax 81 53 484 1014 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia D...

Страница 10: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96470727 1105 216 Repl 96470727 0303 96488980 0303...

Отзывы: