![Grundfos DMX Series Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/grundfos/dmx-series/dmx-series_installation-and-operating-instructions-manual_2271285021.webp)
21
V3.0
DMX model 227
5
Commissioning
5.1
Inspections before Commissioning
●
Check the tightness of all connections. If necessary, retighten.
●
Check the correctness of all electrical connections.
●
Check if the voltage indicated on the type plate corresponds with the local
voltage!
5.2
Commissioning
CAUTION
After initial start-up and after each diaphragm
exchange, tighten the fixing screws of the dosing head:
After approx. 6 to 10 working hours or two days, tighten
the dosing head screws crosswise using a torque
wrench, torque 70-80 Nm.
Fill with gear oil
The pump has been tested in the factory, and the oil drained prior to shipping.
Before using, fill with the supplied special oil as follows:
●
Switch off the pump.
●
Unscrew the venting screw with oil dipstick.
●
Slowly pour the supplied gear oil into the opening of the venting screw until
it reaches the mark on the dipstick.
-
Gear oil for single pumps: 5.0 l
-
Gear oil for dual pumps: 7.5 l
●
Switch of the pump after approx. 10 minutes, check the oil level, and add
more if necessary.
●
Refit the oil dipstick.
Start the pump
●
Switch on the power supply.
●
Pumps with frequency converter: set dosing rate to 100%.
➜
See Operation Manual of frequency converter! See also chapter
Adjustment of dosing rate using frequency converter
●
The pump is now ready for use.
Содержание DMX Series
Страница 6: ...6 15 720023 V3 0 DMX model 227 Type key Cannot be used for pump configuration ...
Страница 37: ......
Страница 38: ......
Страница 39: ......