24
5. Start-up
If the pump is not operating satisfactorily, see section 9. Fault finding chart.
Step
Action
1
Connect the hoses/pipes:
• Connect the suction and dosing tubes/pipes to the pump.
• Connect a tube to the vent valve, if required, and lead the hose to the
tank.
2
Switch on the electricity supply:
• The display is on.
• The green indicator light is flashing (the pump has stopped).
• Select language, if required, see section 4.19.
3
Select the operating mode (see section 4.8):
• Manual.
• Pulse.
• Analog.
• Timer.
• Batch.
4
Connect the cables:
• Connect the control/level cables, if any, to the pump, see section 3.6.
5
Start the pump:
• Start the pump by pressing the on/off button.
• The green indicator light is permanently on.
6
Priming/venting:
• Press the
button on the pump control panel and let the pump run
without a counter pressure. Loosen the vent valve by giving it a 1/8 to
1/4 turn, if required.
When the buttons
and
are pressed simultaneously during prim-
ing, the pump can be set to run for a specific number of seconds at
maximum capacity.
7
Calibration:
• When the pump has been primed and is running at the right counter
pressure, calibrate the pump, see section 6.
100%
100%
100%
100%
100%
Содержание DME 12
Страница 1: ...DME A 2 48 l h GRUNDFOS INSTRUCTIONS Installation and operating instructions ...
Страница 291: ...291 ...
Страница 293: ...293 TM01 9976 3500 14 13 2 4 5 6 7 8 10 11 12 3 9 15 18 ...
Страница 296: ...296 ...